Thurgarton
THUEast MidlandsManaged by East Midlands Railway
How this station is performing
Thurgarton had 6,505 scheduled stops to Period 7 of 2026-27, about 18 a day. 85.2% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Thurgarton opened on 4 August 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Thurgarton is the oldest; the next oldest, Bleasby, dates from 1846.
The nearest stations to Thurgarton are Bleasby (1.8 km north-east), Lowdham (3.5 km south-west), Fiskerton (4.8 km north-east), Rolleston (5.8 km north-east) and Burton Joyce (7.4 km south-west). 7 stations lie within 10 km in all. At 85.2%, Thurgarton is more punctual than every one of them; the best of the five, Lowdham, manages 83.9%.
Thurgarton is one of 2 stations named after a Village called Thurgarton, home to about 445 people; this one stands 1.3 km from its centre.
Thurgarton improved sharply over the past year. In the latest 13 periods 85.2% of stops came within three minutes of the timetable, up 6.9 percentage points from 78.3% in the 13 before. Cancellations held steady at 2.6% of scheduled stops, against 2.3% before.
Compared with 3 stations of a similar size in East Midlands, Thurgarton is the most punctual, at 85.2%. The comparison group includes Market Rasen (79.4%), Rolleston (82.3%) and Bleasby (82.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 6,505 | 85.2% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Thurgarton? Delay Repay
These operators call at Thurgarton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 500 | 87.8% | 1.8% |
| Period 6 of 2026-27 | 500 | 86.8% | 3.4% |
| Period 5 of 2026-27 | 500 | 82.8% | 4.4% |
| Period 4 of 2026-27 | 500 | 85.5% | 2.8% |
| Period 3 of 2026-27 | 500 | 87.2% | 2.4% |
| Period 2 of 2026-27 | 500 | 88.0% | 3.8% |
| Period 1 of 2026-27 | 576 | 89.7% | 1.4% |
| Period 13 of 2025-26 | 549 | 89.6% | 2.0% |
| Period 12 of 2025-26 | 500 | 86.4% | 1.2% |
| Period 11 of 2025-26 | 491 | 91.8% | 2.0% |
| Period 10 of 2025-26 | 456 | 84.9% | 2.4% |
| Period 9 of 2025-26 | 461 | 69.8% | 4.1% |
| Period 8 of 2025-26 | 472 | 73.3% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Market Rasen | 6,224 | 79.4% | 1.7% |
| Rolleston | 6,045 | 82.3% | 2.6% |
| Bleasby | 7,186 | 82.7% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out