Rolleston
ROLEast MidlandsManaged by East Midlands Railway
How this station is performing
Rolleston had 6,045 scheduled stops to Period 7 of 2026-27, about 17 a day. 82.3% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Rolleston opened on 1 July 1847 and closed to passengers on 14 March 1853. It reopened on 1 September 1860, 166 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Fiskerton is the oldest (1846) and Newark Northgate the newest (1852), with Rolleston in between.
The nearest stations to Rolleston are Fiskerton (1.0 km south-west), Bleasby (3.9 km south-west), Thurgarton (5.8 km south-west), Newark Castle (6.0 km east) and Newark Northgate (6.9 km east). 6 stations lie within 10 km in all. Of the five, Thurgarton is the most punctual at 85.2% and Newark Northgate the least at 69.0%, with Rolleston on 82.3%.
Rolleston is one of 3 stations named after a Village called Rolleston, home to about 342 people; this one stands 0.6 km from its centre.
Rolleston improved sharply over the past year. In the latest 13 periods 82.3% of stops came within three minutes of the timetable, up 7.2 percentage points from 75.1% in the 13 before. Cancellations held steady at 2.6% of scheduled stops, against 2.4% before.
1 of 3 stations of a similar size in East Midlands are more punctual than Rolleston on 82.3%. The comparison group includes Market Rasen (79.4%), Thurgarton (85.2%) and Willington (72.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 6,045 | 82.3% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Rolleston? Delay Repay
These operators call at Rolleston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 452 | 85.6% | 1.8% |
| Period 6 of 2026-27 | 452 | 82.4% | 3.3% |
| Period 5 of 2026-27 | 452 | 81.0% | 3.8% |
| Period 4 of 2026-27 | 452 | 80.7% | 2.7% |
| Period 3 of 2026-27 | 452 | 82.1% | 1.8% |
| Period 2 of 2026-27 | 452 | 86.4% | 2.4% |
| Period 1 of 2026-27 | 520 | 88.9% | 1.7% |
| Period 13 of 2025-26 | 497 | 89.3% | 2.8% |
| Period 12 of 2025-26 | 452 | 87.5% | 1.5% |
| Period 11 of 2025-26 | 444 | 90.8% | 2.7% |
| Period 10 of 2025-26 | 431 | 81.9% | 3.0% |
| Period 9 of 2025-26 | 489 | 65.4% | 3.9% |
| Period 8 of 2025-26 | 500 | 63.1% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Market Rasen | 6,224 | 79.4% | 1.7% |
| Thurgarton | 6,505 | 85.2% | 2.6% |
| Willington | 5,178 | 72.2% | 6.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out