Market Rasen
MKREast MidlandsManaged by East Midlands Railway
How this station is performing
Market Rasen has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 6,224 scheduled stops, about 17 a day. In those periods 79.4% of stops arrived within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Market Rasen opened on 1 November 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Market Rasen is the oldest; the next oldest, Brigg, dates from 1848.
Market Rasen is remote: its nearest neighbours are Kirton Lindsey (20.4 km north-west), Brigg (20.9 km north-west), Barnetby (21.8 km north), Lincoln (22.1 km south-west) and Stallingborough (24.8 km north-east). Of the five, Lincoln is the most punctual at 87.8% and Barnetby the least at 72.4%, with Market Rasen on 79.4%.
Market Rasen takes its name from a market town called Market Rasen, home to about 4,087 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Market Rasen was Period 8 of 2023-24, at 60.2%, some time before the latest year. The strongest was Period 11 of 2025-26, at 85.6%, and the two are 25.4 percentage points apart. Cancellations peaked at 7.2% of scheduled stops in Period 8 of 2023-24, against 1.7% over the latest 13 periods.
Compared with 3 stations of a similar size in East Midlands, Market Rasen is the least punctual, at 79.4%. All of them are ahead, including Rolleston (82.3%), Thurgarton (85.2%) and Bleasby (82.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 6,224 | 79.4% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Market Rasen? Delay Repay
These operators call at Market Rasen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 455 | 80.1% | 1.1% |
| Period 6 of 2026-27 | 472 | 78.5% | 0.8% |
| Period 5 of 2026-27 | 472 | 79.9% | 1.9% |
| Period 4 of 2026-27 | 472 | 75.5% | 1.9% |
| Period 3 of 2026-27 | 473 | 74.1% | 1.1% |
| Period 2 of 2026-27 | 467 | 75.1% | 2.8% |
| Period 1 of 2026-27 | 546 | 83.3% | 1.1% |
| Period 13 of 2025-26 | 515 | 84.1% | 1.0% |
| Period 12 of 2025-26 | 472 | 82.5% | 0.8% |
| Period 11 of 2025-26 | 465 | 85.6% | 2.6% |
| Period 10 of 2025-26 | 439 | 81.0% | 2.5% |
| Period 9 of 2025-26 | 484 | 71.7% | 2.9% |
| Period 8 of 2025-26 | 492 | – | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rolleston | 6,045 | 82.3% | 2.6% |
| Thurgarton | 6,505 | 85.2% | 2.6% |
| Bleasby | 7,186 | 82.7% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out