TransPennine Express at Thorne South
All trains at Thorne SouthTransPennine Express across BritainYorkshire and The Humber
How this operator is doing here
TransPennine Express had 611 scheduled stops at Thorne South in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 60.7% of recorded arrivals came within three minutes and 0.0% of stops were cancelled.
TransPennine Express trains at Thorne South also serve Hatfield and Stainforth (4.8 km west, 62.5% on time, 0.0% cancelled), Kirk Sandall (9.1 km south-west, – on time, – cancelled), Crowle (9.2 km east, 62.5% on time, 0.0% cancelled), Althorpe (14.8 km east, 57.1% on time, 0.0% cancelled), Doncaster (15.2 km south-west, 67.9% on time, 2.5% cancelled) and Howden (19.0 km north, 71.2% on time, 2.3% cancelled), which are the stations on its network closest to Thorne South.
Within 30 km of here, TransPennine Express runs best at Brough, 28.4 km north-east (79.2%), and worst at Doncaster, 15.2 km south-west (67.9%).
The busiest TransPennine Express station within 30 km of Thorne South is Selby, 21.2 km north, with about 36 scheduled stops a day.
Of the 2 operators with enough records at Thorne South, TransPennine Express is the least punctual, at 60.7%.
TransPennine Express cancels fewer trains at Thorne South than elsewhere: 0.0% of scheduled stops, against 3.3% across its network and 1.5% for every operator at the station.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 48 | – | – |
| Period 6 of 2026-27 | 48 | – | – |
| Period 5 of 2026-27 | 46 | – | – |
| Period 4 of 2026-27 | 48 | – | – |
| Period 3 of 2026-27 | 47 | – | – |
| Period 2 of 2026-27 | 34 | – | – |
| Period 1 of 2026-27 | 56 | 60.7% | 0.0% |
| Period 13 of 2025-26 | 51 | – | – |
| Period 12 of 2025-26 | 48 | – | – |
| Period 11 of 2025-26 | 48 | – | – |
| Period 10 of 2025-26 | 41 | – | – |
| Period 9 of 2025-26 | 48 | – | – |
| Period 8 of 2025-26 | 48 | – | – |
Other operators at Thorne South
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,036 | 87.9% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out