Thorne South had 5,647 scheduled stops to Period 7 of 2026-27, about 16 a day. 84.4% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Thorne South opened on 1 July 1856. It was moved to the site it uses now on 10 September 1866. Among the 5 stations nearest to it with a known opening date, Rawcliffe is the oldest (1848) and Kirk Sandall the newest (1991), with Thorne South in between.
The nearest stations to Thorne South are Thorne North (1.8 km north-west), Hatfield and Stainforth (4.8 km west), Kirk Sandall (9.1 km south-west), Crowle (9.2 km east) and Rawcliffe (9.5 km north). 5 stations lie within 10 km in all. At 84.4%, Thorne South is more punctual than every one of them; the best of the five, Rawcliffe, manages 84.4%.
Thorne South is named after Thorne, a town, home to about 18,096 people, but the station stands 0.6 km from its centre.
2 operators call at Thorne South: Northern (87.9%, 89% of stops) and TransPennine Express (60.7%, 11% of stops). The operator you travel with matters: Northern reaches 87.9% within three minutes while TransPennine Express manages 60.7%, a gap of 27.2 percentage points.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Thorne South on 84.4%. The comparison group includes Althorpe (84.5%), Crowle (84.1%) and Saltmarshe (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,036 | 87.9% | 1.2% |
| TransPennine Express | 611 | 60.7% | 0.0% |
Operators with their own page for this station are linked to it.
Late train at Thorne South? Delay Repay
These operators call at Thorne South and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 432 | 84.0% | 1.4% |
| Period 6 of 2026-27 | 432 | 84.7% | 1.9% |
| Period 5 of 2026-27 | 430 | 83.8% | 0.7% |
| Period 4 of 2026-27 | 432 | 82.0% | 4.6% |
| Period 3 of 2026-27 | 431 | 85.0% | 0.9% |
| Period 2 of 2026-27 | 402 | 86.4% | 2.7% |
| Period 1 of 2026-27 | 504 | 88.2% | 1.2% |
| Period 13 of 2025-26 | 467 | 89.0% | 1.1% |
| Period 12 of 2025-26 | 432 | 85.5% | 0.9% |
| Period 11 of 2025-26 | 432 | 83.6% | 0.9% |
| Period 10 of 2025-26 | 389 | 83.4% | 1.0% |
| Period 9 of 2025-26 | 432 | 79.1% | 0.2% |
| Period 8 of 2025-26 | 432 | 81.1% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Althorpe | 5,647 | 84.5% | 1.5% |
| Crowle | 5,649 | 84.1% | 1.5% |
| Saltmarshe | 5,538 | 79.3% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out