TransPennine Express at Thirsk
All trains at ThirskTransPennine Express across BritainYorkshire and The Humber
How this operator is doing here
TransPennine Express had 13,274 scheduled stops at Thirsk in the 13 periods to Period 7 of 2026-27, 77% of the station's total. 68.0% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
TransPennine Express trains at Thirsk also serve Northallerton (12.4 km north, 68.6% on time, 2.3% cancelled), Yarm (29.5 km north, 61.4% on time, 1.7% cancelled), Eaglescliffe (33.6 km north, 68.1% on time, 1.8% cancelled), Darlington (34.4 km north, 74.7% on time, 3.3% cancelled), York (35.2 km south-east, 75.7% on time, 1.8% cancelled) and Thornaby (37.1 km north, 70.2% on time, 2.1% cancelled), which are the stations on its network closest to Thirsk.
The busiest TransPennine Express station within 30 km of Thirsk is Northallerton, 12.4 km north, with about 41 scheduled stops a day.
Of the 2 operators with enough records at Thirsk, TransPennine Express is the most punctual, at 68.0%.
For TransPennine Express, Thirsk is the 48th best of 77 ranked stations. Its 68.0% here is 0.8 percentage points below the 68.8% across the whole network.
TransPennine Express at Thirsk has edged up: 68.0% of stops came within three minutes of the timetable in the latest 13 periods, 1.6 percentage points better than the 66.4% of the 13 before. Cancellations held steady at 1.8% of scheduled stops, against 2.1% before.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,044 | 65.2% | 2.1% |
| Period 6 of 2026-27 | 1,031 | 69.4% | 1.6% |
| Period 5 of 2026-27 | 1,040 | 64.5% | 2.9% |
| Period 4 of 2026-27 | 1,045 | 66.7% | 1.5% |
| Period 3 of 2026-27 | 1,038 | 79.7% | 0.6% |
| Period 2 of 2026-27 | 871 | 61.1% | 3.2% |
| Period 1 of 2026-27 | 1,152 | 66.0% | 1.8% |
| Period 13 of 2025-26 | 1,133 | 75.1% | 1.1% |
| Period 12 of 2025-26 | 1,042 | 72.1% | 0.8% |
| Period 11 of 2025-26 | 1,060 | 76.2% | 1.8% |
| Period 10 of 2025-26 | 931 | 71.6% | 0.2% |
| Period 9 of 2025-26 | 1,001 | 56.4% | 1.8% |
| Period 8 of 2025-26 | 886 | 56.3% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Thirsk
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Grand Central | 3,966 | 65.9% | 1.7% |
| LNER | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out