Grand Central at Thirsk
All trains at ThirskGrand Central across BritainYorkshire and The Humber
How this operator is doing here
Grand Central had 3,966 scheduled stops at Thirsk in the 13 periods to Period 7 of 2026-27, 23% of the station's total. 65.9% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Grand Central trains at Thirsk also serve Northallerton (12.4 km north, 60.4% on time, 1.8% cancelled), Eaglescliffe (33.6 km north, 57.9% on time, 2.0% cancelled), Darlington (34.4 km north, – on time, – cancelled), York (35.2 km south-east, 59.5% on time, 2.2% cancelled), Hartlepool (52.1 km north, 61.3% on time, 2.2% cancelled) and Bradford Interchange (54.6 km south-west, 68.1% on time, 2.2% cancelled), which are the stations on its network closest to Thirsk.
The busiest Grand Central station within 30 km of Thirsk is Northallerton, 12.4 km north, with about 11 scheduled stops a day.
Of the 2 operators with enough records at Thirsk, Grand Central is the least punctual, at 65.9%.
For Grand Central, Thirsk is the 5th best of 17 ranked stations. Its 65.9% here is 3.7 percentage points above the 62.2% across the whole network.
Over three full railway years Grand Central at Thirsk has improved each time, from 64.7% within three minutes in 2023-24 to 67.9% in 2024-25 and 68.4% in 2025-26.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 327 | 65.4% | 1.8% |
| Period 6 of 2026-27 | 316 | 62.8% | 2.2% |
| Period 5 of 2026-27 | 327 | 64.9% | 2.4% |
| Period 4 of 2026-27 | 323 | 59.4% | 0.0% |
| Period 3 of 2026-27 | 328 | 63.2% | 1.5% |
| Period 2 of 2026-27 | 269 | 57.6% | 2.6% |
| Period 1 of 2026-27 | 363 | 65.4% | 2.2% |
| Period 13 of 2025-26 | 304 | 75.6% | 0.3% |
| Period 12 of 2025-26 | 257 | 71.8% | 0.8% |
| Period 11 of 2025-26 | 315 | 74.7% | 1.0% |
| Period 10 of 2025-26 | 282 | 67.6% | 1.4% |
| Period 9 of 2025-26 | 293 | 68.0% | 3.1% |
| Period 8 of 2025-26 | 262 | 59.3% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Thirsk
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 13,274 | 68.0% | 1.8% |
| LNER | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out