Theale
THESouth EastManaged by Great Western Railway
How this station is performing
Theale had 25,236 scheduled stops to Period 7 of 2026-27, about 69 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Theale opened on 21 December 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Pangbourne is the oldest (1840) and Reading Green Park the newest (2023), with Theale in between.
The nearest stations to Theale are Reading Green Park (5.2 km east), Tilehurst (5.3 km north-east), Aldermaston (5.5 km south-west), Pangbourne (5.9 km north) and Reading West (6.3 km east). 8 stations lie within 10 km in all. At 79.2%, Theale is less punctual than all of them; the best of the five, Reading Green Park, manages 86.0%.
Theale is one of 2 stations named after a Village called Theale, home to about 3,053 people; this one stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Theale was Period 5 of 2023-24, at 67.4%, some time before the latest year. The strongest was Period 2 of 2025-26, at 85.6%, and the two are 18.2 percentage points apart. Cancellations peaked at 11.0% of scheduled stops in Period 10 of 2023-24, against 2.5% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Theale on 79.2%. The comparison group includes Thatcham (77.8%), Thames Ditton (88.5%) and Maidstone West (94.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 25,236 | 79.2% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Theale? Delay Repay
These operators call at Theale and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,948 | 80.2% | 2.2% |
| Period 6 of 2026-27 | 1,862 | 76.1% | 2.1% |
| Period 5 of 2026-27 | 1,961 | 73.6% | 2.0% |
| Period 4 of 2026-27 | 1,964 | 73.0% | 2.3% |
| Period 3 of 2026-27 | 1,723 | 77.4% | 3.2% |
| Period 2 of 2026-27 | 1,920 | 81.0% | 3.6% |
| Period 1 of 2026-27 | 2,264 | 83.6% | 2.2% |
| Period 13 of 2025-26 | 2,156 | 84.7% | 1.9% |
| Period 12 of 2025-26 | 1,958 | 85.2% | 2.1% |
| Period 11 of 2025-26 | 1,874 | 82.6% | 3.6% |
| Period 10 of 2025-26 | 1,691 | 82.7% | 3.4% |
| Period 9 of 2025-26 | 1,960 | 73.4% | 1.7% |
| Period 8 of 2025-26 | 1,955 | 74.8% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Thatcham | 25,235 | 77.8% | 2.6% |
| Thames Ditton | 25,288 | 88.5% | 3.2% |
| Maidstone West | 25,158 | 94.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out