Thames Ditton
THDSouth EastManaged by South Western Railway
How this station is performing
Thames Ditton had 25,288 scheduled stops to Period 7 of 2026-27, about 70 a day. 88.5% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
The nearest stations to Thames Ditton are Esher (1.4 km south-west), Hampton Court (1.5 km north), Hinchley Wood (1.6 km south), Surbiton (2.5 km east) and Claygate (3.2 km south). 51 stations lie within 10 km in all. At 88.5%, Thames Ditton is more punctual than every one of them; the best of the five, Hampton Court, manages 86.3%.
Thames Ditton takes its name from a Village called Thames Ditton, home to about 9,400 people, and the station stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Thames Ditton was Period 9 of 2024-25, at 73.7%, some time before the latest year. The strongest was Period 5 of 2023-24, at 95.6%, and the two are 21.9 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 2 of 2026-27, against 3.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Thames Ditton is the most punctual, at 88.5%. The comparison group includes Earley (85.3%), Winnersh Triangle (85.8%) and Theale (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 25,288 | 88.5% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Thames Ditton? Delay Repay
These operators call at Thames Ditton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,942 | 92.1% | 2.6% |
| Period 6 of 2026-27 | 2,004 | 93.1% | 2.0% |
| Period 5 of 2026-27 | 1,941 | 91.6% | 3.9% |
| Period 4 of 2026-27 | 1,975 | 92.4% | 1.9% |
| Period 3 of 2026-27 | 1,681 | 90.9% | 5.1% |
| Period 2 of 2026-27 | 1,905 | 85.2% | 6.9% |
| Period 1 of 2026-27 | 2,269 | 90.9% | 2.6% |
| Period 13 of 2025-26 | 1,940 | 91.4% | 1.1% |
| Period 12 of 2025-26 | 1,979 | 85.7% | 5.3% |
| Period 11 of 2025-26 | 1,976 | 87.6% | 0.8% |
| Period 10 of 2025-26 | 1,814 | 88.5% | 3.7% |
| Period 9 of 2025-26 | 1,887 | 77.5% | 1.6% |
| Period 8 of 2025-26 | 1,975 | 83.3% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Earley | 25,326 | 85.3% | 2.7% |
| Winnersh Triangle | 25,326 | 85.8% | 2.7% |
| Theale | 25,236 | 79.2% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out