Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Thatto Heath

THHNorth WestManaged by Northern Trains

On time, last 13 periods90.7%Great Britain: 83.6%
Cancelled2.5%Great Britain: 3.2%
Stops a day62Scheduled, on average
Punctuality rank478th of 2,374Among ranked stations

How this station is performing

Thatto Heath had 22,682 scheduled stops to Period 7 of 2026-27, about 62 a day. 90.7% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.

Thatto Heath opened on 1 January 1872, 154 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Rainhill is the oldest (1830) and Eccleston Park the newest (1891), with Thatto Heath in between.

The nearest stations to Thatto Heath are Eccleston Park (1.5 km south-west), Rainhill (2.2 km south), Lea Green (2.5 km south-east), St Helens Central (2.6 km north-east) and Prescot (3.0 km south-west). 19 stations lie within 10 km in all. At 90.7%, Thatto Heath is more punctual than every one of them; the best of the five, Eccleston Park, manages 90.6%.

Thatto Heath takes its name from a suburb called Thatto Heath, home to about 12,280 people, and the station stands 0.8 km from its centre.

Across the whole run of data, the weakest four-week period for Thatto Heath was Period 9 of 2023-24, at 79.5%, some time before the latest year. The strongest was Period 13 of 2023-24, at 94.6%, and the two are 15.1 percentage points apart. Cancellations peaked at 12.0% of scheduled stops in Period 6 of 2024-25, against 2.5% over the latest 13 periods.

Compared with 3 stations of a similar size in North West, Thatto Heath is the most punctual, at 90.7%. The comparison group includes Eccleston Park (90.6%), Bryn (89.5%) and Hough Green (67.0%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 4 of 2023-24: 93.0%Period 6 of 2023-24: 89.9%Period 7 of 2023-24: 87.2%Period 8 of 2023-24: 86.2%Period 9 of 2023-24: 79.5%Period 10 of 2023-24: 92.7%Period 11 of 2023-24: 92.4%Period 12 of 2023-24: 93.1%Period 13 of 2023-24: 94.6%Period 1 of 2024-25: 93.7%Period 2 of 2024-25: 92.6%Period 3 of 2024-25: 93.3%Period 4 of 2024-25: 92.7%Period 5 of 2024-25: 92.3%Period 6 of 2024-25: 88.7%Period 7 of 2024-25: 87.1%Period 8 of 2024-25: 81.3%Period 9 of 2024-25: 86.3%Period 10 of 2024-25: 90.8%Period 11 of 2024-25: 88.7%Period 12 of 2024-25: 92.1%Period 13 of 2024-25: 93.3%Period 1 of 2025-26: 94.4%Period 2 of 2025-26: 94.4%Period 3 of 2025-26: 91.2%Period 4 of 2025-26: 91.2%Period 5 of 2025-26: 90.3%Period 6 of 2025-26: 90.5%Period 7 of 2025-26: 87.7%Period 8 of 2025-26: 88.5%Period 9 of 2025-26: 83.7%Period 10 of 2025-26: 84.9%Period 11 of 2025-26: 92.3%Period 12 of 2025-26: 91.6%Period 13 of 2025-26: 91.5%Period 1 of 2026-27: 93.8%Period 2 of 2026-27: 91.9%Period 3 of 2026-27: 92.6%Period 4 of 2026-27: 92.2%Period 5 of 2026-27: 90.9%Period 6 of 2026-27: 92.7%Period 7 of 2026-27: 92.4%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 3.0%Period 2 of 2023-24: 1.1%Period 3 of 2023-24: 4.3%Period 4 of 2023-24: 2.1%Period 5 of 2023-24: 4.7%Period 6 of 2023-24: 4.9%Period 7 of 2023-24: 5.2%Period 8 of 2023-24: 4.5%Period 9 of 2023-24: 8.8%Period 10 of 2023-24: 8.5%Period 11 of 2023-24: 5.8%Period 12 of 2023-24: 3.2%Period 13 of 2023-24: 4.0%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 7.1%Period 3 of 2024-25: 6.6%Period 4 of 2024-25: 8.0%Period 5 of 2024-25: 7.2%Period 6 of 2024-25: 12.0%Period 7 of 2024-25: 5.5%Period 8 of 2024-25: 7.2%Period 9 of 2024-25: 11.5%Period 10 of 2024-25: 8.5%Period 11 of 2024-25: 4.5%Period 12 of 2024-25: 5.5%Period 13 of 2024-25: 2.0%Period 1 of 2025-26: 2.3%Period 2 of 2025-26: 2.9%Period 3 of 2025-26: 4.0%Period 4 of 2025-26: 2.6%Period 5 of 2025-26: 3.1%Period 6 of 2025-26: 5.4%Period 7 of 2025-26: 5.7%Period 8 of 2025-26: 2.9%Period 9 of 2025-26: 3.8%Period 10 of 2025-26: 7.0%Period 11 of 2025-26: 1.1%Period 12 of 2025-26: 1.5%Period 13 of 2025-26: 3.2%Period 1 of 2026-27: 1.3%Period 2 of 2026-27: 2.3%Period 3 of 2026-27: 1.6%Period 4 of 2026-27: 1.3%Period 5 of 2026-27: 4.2%Period 6 of 2026-27: 1.4%Period 7 of 2026-27: 1.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern22,68290.7%2.5%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,74092.4%1.0%
Period 6 of 2026-271,73592.7%1.4%
Period 5 of 2026-271,73290.9%4.2%
Period 4 of 2026-271,74092.2%1.3%
Period 3 of 2026-271,57692.6%1.6%
Period 2 of 2026-271,73491.9%2.3%
Period 1 of 2026-272,01893.8%1.3%
Period 13 of 2025-261,89891.5%3.2%
Period 12 of 2025-261,74091.6%1.5%
Period 11 of 2025-261,73792.3%1.1%
Period 10 of 2025-261,58284.9%7.0%
Period 9 of 2025-261,71783.7%3.8%
Period 8 of 2025-261,73388.5%2.9%

Time of year

75%80%85%90%95%P1: 94.0%1P2: 93.0%2P3: 92.3%3P4: 92.2%4P5: 91.1%5P6: 90.7%6P7: 88.9%7P8: 85.4%8P9: 83.7%9P10: 88.9%10P11: 91.1%11P12: 92.2%12P13: 93.1%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Eccleston Park22,68290.6%2.5%
Bryn22,69989.5%2.5%
Hough Green22,53567.0%3.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out