Bryn
BYNNorth WestManaged by Northern Trains
How this station is performing
Bryn had 22,699 scheduled stops to Period 7 of 2026-27, about 62 a day. 89.5% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Bryn opened on 1 December 1869, 157 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bryn is the newest; the oldest, Wigan North Western, opened in 1832.
The nearest stations to Bryn are Garswood (2.1 km south-west), Pemberton (3.7 km north-west), Ince (Manchester) (4.9 km north-east), Wigan North Western (4.9 km north) and Wigan Wallgate (5.1 km north). 17 stations lie within 10 km in all. Of the five, Garswood is the most punctual at 89.6% and Wigan North Western the least at 72.4%, with Bryn on 89.5%.
Bryn is one of 8 stations named after a Village called Bryn, home to about 11,662 people; this one stands 0.6 km from its centre.
The time of year matters a great deal for Bryn. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 81.6%, while period 1 (April) is the strongest at 92.8%, a spread of 11.2 percentage points.
2 of 3 stations of a similar size in North West are more punctual than Bryn on 89.5%. The comparison group includes Eccleston Park (90.6%), Thatto Heath (90.7%) and Hough Green (67.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 22,699 | 89.5% | 2.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,744 | 91.5% | 1.0% |
| Period 6 of 2026-27 | 1,735 | 92.3% | 1.4% |
| Period 5 of 2026-27 | 1,736 | 89.8% | 4.1% |
| Period 4 of 2026-27 | 1,743 | 91.1% | 2.0% |
| Period 3 of 2026-27 | 1,560 | 91.7% | 1.6% |
| Period 2 of 2026-27 | 1,738 | 91.1% | 2.2% |
| Period 1 of 2026-27 | 2,022 | 93.1% | 1.3% |
| Period 13 of 2025-26 | 1,898 | 90.8% | 3.3% |
| Period 12 of 2025-26 | 1,744 | 90.8% | 1.4% |
| Period 11 of 2025-26 | 1,740 | 90.7% | 1.1% |
| Period 10 of 2025-26 | 1,582 | 84.5% | 7.1% |
| Period 9 of 2025-26 | 1,721 | 80.2% | 3.7% |
| Period 8 of 2025-26 | 1,736 | 85.6% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eccleston Park | 22,682 | 90.6% | 2.5% |
| Thatto Heath | 22,682 | 90.7% | 2.5% |
| Hough Green | 22,535 | 67.0% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out