How this station is performing
Hough Green had 22,535 scheduled stops to Period 7 of 2026-27, about 62 a day. 67.0% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Hough Green opened on 1 May 1874, 152 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Rainhill is the oldest (1830) and Whiston the newest (1990), with Hough Green in between.
The nearest stations to Hough Green are Widnes (2.8 km east), Halewood (3.8 km west), Runcorn (4.4 km south-east), Whiston (4.8 km north) and Rainhill (5.0 km north). 23 stations lie within 10 km in all. At 67.0%, Hough Green is less punctual than all of them; the best of the five, Halewood, manages 77.8%.
Hough Green takes its name from a suburb called Hough Green, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Hough Green was Period 9 of 2023-24, at 57.3%, some time before the latest year. The strongest was Period 13 of 2023-24, at 82.8%, and the two are 25.5 percentage points apart. Cancellations peaked at 12.7% of scheduled stops in Period 10 of 2024-25, against 3.5% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Hough Green is the least punctual, at 67.0%. All of them are ahead, including Atherton (83.9%), Daisy Hill (85.7%) and Swinton (Manchester) (82.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 22,534 | 67.0% | 3.5% |
| East Midlands Railway | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Hough Green? Delay Repay
These operators call at Hough Green and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,724 | 69.1% | 2.3% |
| Period 6 of 2026-27 | 1,728 | 69.5% | 2.0% |
| Period 5 of 2026-27 | 1,736 | 69.8% | 4.6% |
| Period 4 of 2026-27 | 1,691 | 68.8% | 3.6% |
| Period 3 of 2026-27 | 1,563 | 66.6% | 2.9% |
| Period 2 of 2026-27 | 1,723 | 67.5% | 3.8% |
| Period 1 of 2026-27 | 1,997 | 63.8% | 3.1% |
| Period 13 of 2025-26 | 1,894 | 70.7% | 1.8% |
| Period 12 of 2025-26 | 1,734 | 69.9% | 2.1% |
| Period 11 of 2025-26 | 1,725 | 68.0% | 1.8% |
| Period 10 of 2025-26 | 1,561 | 65.0% | 8.5% |
| Period 9 of 2025-26 | 1,732 | 58.6% | 5.8% |
| Period 8 of 2025-26 | 1,727 | 62.1% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Atherton | 22,420 | 83.9% | 4.2% |
| Daisy Hill | 22,420 | 85.7% | 4.2% |
| Swinton (Manchester) | 22,420 | 82.5% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out