CrossCountry at Tamworth
All trains at TamworthCrossCountry across BritainWest Midlands
How this operator is doing here
CrossCountry had 27,910 scheduled stops at Tamworth in the 13 periods to Period 7 of 2026-27, 58% of the station's total. 68.2% of recorded arrivals came within three minutes and 5.6% of stops were cancelled.
CrossCountry trains at Tamworth also serve Wilnecote (Staffs) (3.0 km south, 74.1% on time, 6.4% cancelled), Coleshill Parkway (13.5 km south, 66.2% on time, 3.3% cancelled), Water Orton (13.8 km south, 66.2% on time, 4.3% cancelled), Burton-on-Trent (19.0 km north, 68.9% on time, 5.5% cancelled), Nuneaton (19.4 km south-east, 64.1% on time, 3.2% cancelled) and Birmingham International (20.9 km south, 52.1% on time, 4.8% cancelled), which are the stations on its network closest to Tamworth.
Within 30 km of here, CrossCountry runs best at Wilnecote (Staffs), 3.0 km south (74.1%), and worst at Birmingham International, 20.9 km south (52.1%).
The busiest CrossCountry station within 30 km of Tamworth is Birmingham New Street, 22.8 km south-west, with about 237 scheduled stops a day.
CrossCountry at Tamworth has slipped a little, from 72.7% within three minutes in the previous 13 periods to 68.2% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 5.6% of scheduled stops from 5.1%, which is 0.5 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,194 | 65.8% | 5.2% |
| Period 6 of 2026-27 | 2,077 | 64.5% | 5.6% |
| Period 5 of 2026-27 | 2,086 | 62.8% | 3.1% |
| Period 4 of 2026-27 | 1,983 | 61.0% | 5.4% |
| Period 3 of 2026-27 | 2,026 | 65.0% | 7.4% |
| Period 2 of 2026-27 | 2,171 | 64.5% | 8.5% |
| Period 1 of 2026-27 | 2,494 | 74.5% | 2.8% |
| Period 13 of 2025-26 | 2,351 | 73.0% | 4.5% |
| Period 12 of 2025-26 | 2,150 | 76.0% | 2.4% |
| Period 11 of 2025-26 | 2,121 | 78.8% | 4.6% |
| Period 10 of 2025-26 | 1,934 | 69.7% | 11.6% |
| Period 9 of 2025-26 | 2,198 | 60.3% | 7.5% |
| Period 8 of 2025-26 | 2,125 | 67.8% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tamworth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,280 | 43.1% | 6.2% |
| Avanti | 7,902 | 45.6% | 8.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out