Avanti at Tamworth
How this operator is doing here
Avanti had 7,902 scheduled stops at Tamworth in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 45.6% of recorded arrivals came within three minutes and 8.2% of stops were cancelled.
Avanti trains at Tamworth also serve Lichfield Trent Valley (9.4 km north-west, 45.5% on time, 8.1% cancelled), Nuneaton (19.4 km south-east, 50.1% on time, 8.0% cancelled), Birmingham International (20.9 km south, 56.8% on time, 8.5% cancelled), Rugeley Trent Valley (22.0 km north-west, – on time, – cancelled), Birmingham New Street (22.8 km south-west, 53.6% on time, 9.2% cancelled) and Sandwell and Dudley (26.2 km south-west, 59.4% on time, 7.3% cancelled), which are the stations on its network closest to Tamworth.
Within 30 km of here, Avanti runs best at Wolverhampton, 29.8 km west (62.1%), and worst at Lichfield Trent Valley, 9.4 km north-west (45.5%).
The busiest Avanti station within 30 km of Tamworth is Birmingham New Street, 22.8 km south-west, with about 89 scheduled stops a day.
Avanti ranks 2nd of the 3 operators with enough records at Tamworth, on 45.6%.
Avanti at Tamworth has not moved in one direction over three full railway years: 55.2% within three minutes in 2023-24, 47.1% in 2024-25 and 48.5% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 665 | 44.4% | 3.9% |
| Period 6 of 2026-27 | 677 | 35.7% | 6.5% |
| Period 5 of 2026-27 | 536 | 40.7% | 13.4% |
| Period 4 of 2026-27 | 671 | 32.5% | 15.2% |
| Period 3 of 2026-27 | 707 | 44.2% | 8.2% |
| Period 2 of 2026-27 | 641 | 49.0% | 13.1% |
| Period 1 of 2026-27 | 622 | 54.9% | 5.9% |
| Period 13 of 2025-26 | 743 | 54.5% | 3.9% |
| Period 12 of 2025-26 | 688 | 55.5% | 5.7% |
| Period 11 of 2025-26 | 596 | 47.6% | 9.1% |
| Period 10 of 2025-26 | 369 | 47.5% | 8.1% |
| Period 9 of 2025-26 | 515 | 39.9% | 9.7% |
| Period 8 of 2025-26 | 472 | 41.9% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tamworth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 27,910 | 68.2% | 5.6% |
| West Midlands Railway | 12,280 | 43.1% | 6.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out