Tame Bridge Parkway
TABWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Tame Bridge Parkway had 53,827 scheduled stops to Period 7 of 2026-27, about 148 a day. 87.7% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Tame Bridge Parkway opened on 4 July 1837 and closed to passengers on 7 May 1945. It reopened on 4 June 1990, 36 years before the latest figures. Of the 4 stations nearest to it with a known opening date, Tame Bridge Parkway is the oldest; the next oldest, Walsall, dates from 1847.
The nearest stations to Tame Bridge Parkway are Bescot Stadium (1.5 km north-west), Walsall (3.6 km north), Darlaston (4.0 km north-west), Hamstead (Birmingham) (4.0 km south-east) and The Hawthorns (5.2 km south). 28 stations lie within 10 km in all. Of the five, Walsall is the most punctual at 91.7% and The Hawthorns the least at 87.5%, with Tame Bridge Parkway on 87.7%.
The time of year matters a great deal for Tame Bridge Parkway. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 80.8%, while period 13 (March) is the strongest at 91.5%, a spread of 10.7 percentage points.
Compared with 3 stations of a similar size in West Midlands, Tame Bridge Parkway is the most punctual, at 87.7%. The comparison group includes Worcester Foregate Street (76.0%), Birmingham Snow Hill (86.8%) and Sandwell and Dudley (69.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 53,827 | 87.7% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Tame Bridge Parkway? Delay Repay
These operators call at Tame Bridge Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,255 | 85.3% | 2.4% |
| Period 6 of 2026-27 | 4,256 | 86.6% | 1.6% |
| Period 5 of 2026-27 | 3,698 | 87.4% | 5.5% |
| Period 4 of 2026-27 | 3,521 | 79.8% | 4.8% |
| Period 3 of 2026-27 | 3,690 | 88.1% | 2.1% |
| Period 2 of 2026-27 | 3,841 | 86.2% | 3.5% |
| Period 1 of 2026-27 | 4,961 | 89.5% | 1.8% |
| Period 13 of 2025-26 | 4,609 | 90.6% | 2.3% |
| Period 12 of 2025-26 | 4,282 | 93.0% | 0.9% |
| Period 11 of 2025-26 | 4,214 | 91.1% | 6.0% |
| Period 10 of 2025-26 | 3,884 | 89.9% | 1.6% |
| Period 9 of 2025-26 | 4,308 | 83.2% | 5.1% |
| Period 8 of 2025-26 | 4,308 | 87.0% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Worcester Foregate Street | 52,194 | 76.0% | 5.6% |
| Birmingham Snow Hill | 51,825 | 86.8% | 3.2% |
| Sandwell and Dudley | 50,039 | 69.0% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out