Birmingham Snow Hill
BSWWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Birmingham Snow Hill had 51,825 scheduled stops to Period 7 of 2026-27, about 142 a day. 86.8% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Birmingham Snow Hill opened on 1 October 1852 and closed to passengers on 6 March 1972. It reopened on 5 October 1987, 39 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Birmingham Snow Hill is the oldest; the next oldest, Birmingham New Street, dates from 1854.
The nearest stations to Birmingham Snow Hill are Birmingham New Street (0.7 km south), Birmingham Moor Street (0.7 km south-east), Jewellery Quarter (1.1 km north-west), Five Ways (1.7 km south-west) and Bordesley (2.0 km south-east). 38 stations lie within 10 km in all. Of the five, Birmingham Moor Street is the most punctual at 87.8% and Birmingham New Street the least at 67.9%, with Birmingham Snow Hill on 86.8%.
Birmingham Snow Hill is named after Birmingham, a college town, home to about 1,137,100 people, but the station stands 0.5 km from its centre.
2 operators call at Birmingham Snow Hill: West Midlands Railway (87.0%, 86% of stops) and Chiltern Railways (85.4%, 14% of stops). They are close together, with West Midlands Railway leading on 87.0% and Chiltern Railways trailing on 85.4%, a gap of 1.6 percentage points.
Compared with 3 stations of a similar size in West Midlands, Birmingham Snow Hill is the most punctual, at 86.8%. The comparison group includes Worcester Foregate Street (76.0%), Sandwell and Dudley (69.0%) and Duddeston (84.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 44,590 | 87.0% | 3.2% |
| Chiltern Railways | 7,235 | 85.4% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Birmingham Snow Hill? Delay Repay
These operators call at Birmingham Snow Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,072 | 84.7% | 1.5% |
| Period 6 of 2026-27 | 4,050 | 85.9% | 1.8% |
| Period 5 of 2026-27 | 3,412 | 83.8% | 5.9% |
| Period 4 of 2026-27 | 3,801 | 81.3% | 4.7% |
| Period 3 of 2026-27 | 3,850 | 85.2% | 3.3% |
| Period 2 of 2026-27 | 3,763 | 85.8% | 3.5% |
| Period 1 of 2026-27 | 4,615 | 89.8% | 2.6% |
| Period 13 of 2025-26 | 4,456 | 90.4% | 3.0% |
| Period 12 of 2025-26 | 4,084 | 91.3% | 1.8% |
| Period 11 of 2025-26 | 3,959 | 90.5% | 3.2% |
| Period 10 of 2025-26 | 3,559 | 87.6% | 3.2% |
| Period 9 of 2025-26 | 4,093 | 84.0% | 3.4% |
| Period 8 of 2025-26 | 4,111 | 85.9% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Worcester Foregate Street | 52,194 | 76.0% | 5.6% |
| Sandwell and Dudley | 50,039 | 69.0% | 4.5% |
| Duddeston | 49,921 | 84.3% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out