Ashurst New Forest
ANFSouth EastManaged by South Western Railway
How this station is performing
Ashurst New Forest had 15,184 scheduled stops to Period 7 of 2026-27, about 42 a day. 71.6% of recorded arrivals were within three minutes of the timetable and 5.9% of scheduled stops were cancelled.
Ashurst New Forest opened on 1 June 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ashurst New Forest is the oldest; the next oldest, Beaulieu Road, dates from 1847.
The nearest stations to Ashurst New Forest are Beaulieu Road (4.2 km south), Totton (4.3 km north-east), Redbridge (5.2 km north-east), Millbrook (Hants) (6.9 km east) and Southampton Central (8.1 km east). 6 stations lie within 10 km in all. Of the five, Millbrook (Hants) is the most punctual at 79.1% and Totton the least at 68.7%, with Ashurst New Forest on 71.6%.
Ashurst New Forest is named after Ashurst, a Village, home to about 2,093 people, but the station stands 0.9 km from its centre.
Compared with 3 stations of a similar size in South East, Ashurst New Forest is the least punctual, at 71.6%. All of them are ahead, including Warblington (75.1%), Swaythling (75.4%) and Minster (82.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 15,184 | 71.6% | 5.9% |
Operators with their own page for this station are linked to it.
Late train at Ashurst New Forest? Delay Repay
These operators call at Ashurst New Forest and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,113 | 60.0% | 3.7% |
| Period 6 of 2026-27 | 1,177 | 74.3% | 2.0% |
| Period 5 of 2026-27 | 1,183 | 64.8% | 5.6% |
| Period 4 of 2026-27 | 1,180 | 60.2% | 6.6% |
| Period 3 of 2026-27 | 1,119 | 75.4% | 8.7% |
| Period 2 of 2026-27 | 1,177 | 73.8% | 10.5% |
| Period 1 of 2026-27 | 1,285 | 82.7% | 3.3% |
| Period 13 of 2025-26 | 1,315 | 82.8% | 6.6% |
| Period 12 of 2025-26 | 1,079 | 80.3% | 7.8% |
| Period 11 of 2025-26 | 1,180 | 81.3% | 7.4% |
| Period 10 of 2025-26 | 1,039 | 77.6% | 3.9% |
| Period 9 of 2025-26 | 1,186 | 56.1% | 5.5% |
| Period 8 of 2025-26 | 1,151 | 61.3% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warblington | 15,213 | 75.1% | 6.1% |
| Swaythling | 15,013 | 75.4% | 2.5% |
| Minster | 15,494 | 82.4% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out