GTR at Swanwick
How this operator is doing here
GTR had 21,763 scheduled stops at Swanwick in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 77.7% of recorded arrivals came within three minutes and 7.4% of stops were cancelled.
GTR trains at Swanwick also serve Netley (5.3 km west, – on time, – cancelled), Fareham (5.7 km south-east, 78.7% on time, 6.2% cancelled), Sholing (7.3 km west, – on time, – cancelled), Woolston (8.2 km west, 84.5% on time, 7.6% cancelled), St Denys (10.0 km north-west, – on time, – cancelled) and Portchester (10.3 km east, 79.2% on time, 5.7% cancelled), which are the stations on its network closest to Swanwick.
Within 30 km of here, GTR runs best at Woolston, 8.2 km west (84.5%), and worst at Bosham, 29.6 km east (71.6%).
The busiest GTR station within 30 km of Swanwick is Havant, 20.1 km east, with about 159 scheduled stops a day.
Of the 2 operators with enough records at Swanwick, GTR is the most punctual, at 77.7%.
GTR at Swanwick has slipped sharply. 77.7% of stops came within three minutes of the timetable in the latest 13 periods, 7.5 percentage points worse than the 85.2% recorded in the 13 before. Cancellations held steady at 7.4% of scheduled stops, against 7.2% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,685 | 77.8% | 6.5% |
| Period 6 of 2026-27 | 1,566 | 63.1% | 7.0% |
| Period 5 of 2026-27 | 1,714 | – | 4.6% |
| Period 4 of 2026-27 | 1,680 | 79.7% | 4.8% |
| Period 3 of 2026-27 | 1,580 | – | 9.7% |
| Period 2 of 2026-27 | 1,685 | – | 10.9% |
| Period 1 of 2026-27 | 1,922 | 78.1% | 7.0% |
| Period 13 of 2025-26 | 1,847 | – | 6.3% |
| Period 12 of 2025-26 | 1,517 | – | 7.4% |
| Period 11 of 2025-26 | 1,715 | 85.9% | 7.8% |
| Period 10 of 2025-26 | 1,481 | 80.7% | 9.4% |
| Period 9 of 2025-26 | 1,685 | – | 5.6% |
| Period 8 of 2025-26 | 1,686 | – | 9.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Swanwick
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 13,771 | 77.4% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out