Swanwick
SNWSouth EastManaged by South Western Railway
How this station is performing
Swanwick had 35,534 scheduled stops to Period 7 of 2026-27, about 98 a day. 77.5% of recorded arrivals were within three minutes of the timetable and 5.2% of scheduled stops were cancelled.
Swanwick opened on 2 September 1889, 137 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Fareham is the oldest (1841) and Hamble the newest (1942), with Swanwick in between.
The nearest stations to Swanwick are Bursledon (2.9 km west), Hamble (4.5 km west), Botley (4.6 km north), Netley (5.3 km west) and Fareham (5.7 km south-east). 9 stations lie within 10 km in all. Of the five, Netley is the most punctual at 79.2% and Botley the least at 70.5%, with Swanwick on 77.5%.
Swanwick is one of 3 stations named after a Village called Swanwick; this one stands 0.6 km from its centre.
2 operators call at Swanwick: GTR (77.7%, 61% of stops) and South Western Railway (77.4%, 39% of stops). They are close together, with GTR leading on 77.7% and South Western Railway trailing on 77.4%, a gap of 0.3 percentage points.
Compared with 3 stations of a similar size in South East, Swanwick is the least punctual, at 77.5%. All of them are ahead, including Aylesbury (90.1%), Iver (83.9%) and Farnborough (Main) (79.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 21,763 | 77.7% | 7.4% |
| South Western Railway | 13,771 | 77.4% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Swanwick? Delay Repay
These operators call at Swanwick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,750 | 74.4% | 4.8% |
| Period 6 of 2026-27 | 2,560 | 64.4% | 4.8% |
| Period 5 of 2026-27 | 2,782 | 70.4% | 3.2% |
| Period 4 of 2026-27 | 2,713 | 75.7% | 3.4% |
| Period 3 of 2026-27 | 2,636 | 76.8% | 7.1% |
| Period 2 of 2026-27 | 2,749 | 75.1% | 8.2% |
| Period 1 of 2026-27 | 3,143 | 81.1% | 4.9% |
| Period 13 of 2025-26 | 3,012 | 82.2% | 4.0% |
| Period 12 of 2025-26 | 2,503 | 83.6% | 5.3% |
| Period 11 of 2025-26 | 2,779 | 86.5% | 5.6% |
| Period 10 of 2025-26 | 2,422 | 82.2% | 6.4% |
| Period 9 of 2025-26 | 2,747 | 75.5% | 3.9% |
| Period 8 of 2025-26 | 2,738 | 79.3% | 6.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aylesbury | 35,091 | 90.1% | 1.1% |
| Iver | 36,304 | 83.9% | 4.7% |
| Farnborough (Main) | 34,594 | 79.6% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out