Southeastern at Swanscombe
All trains at SwanscombeSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 27,240 scheduled stops at Swanscombe in the 13 periods to Period 7 of 2026-27, 52% of the station's total. 86.1% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Southeastern trains at Swanscombe also serve Ebbsfleet International (0.9 km south-east, 81.2% on time, 1.7% cancelled), Northfleet (0.9 km east, 86.5% on time, 1.9% cancelled), Greenhithe for Bluewater (2.2 km west, 82.0% on time, 3.0% cancelled), Stone Crossing (3.3 km west, 86.6% on time, 1.8% cancelled), Gravesend (3.9 km east, 81.4% on time, 3.0% cancelled) and Longfield (5.9 km south, 78.6% on time, 2.0% cancelled), which are the stations on its network closest to Swanscombe.
Within 30 km of here, Southeastern runs best at Sundridge Park, 20.5 km west (99.4%), and worst at Newington, 26.8 km south-east (69.0%).
The busiest Southeastern station within 30 km of Swanscombe is London Bridge, 28.2 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Swanscombe, Southeastern is the most punctual, at 86.1%.
For Southeastern, Swanscombe is the 63rd best of 173 ranked stations. Its 86.1% here is 1.9 percentage points above the 84.2% across the whole network.
Southeastern at Swanscombe has edged up: 86.1% of stops came within three minutes of the timetable in the latest 13 periods, 1.8 percentage points better than the 84.3% of the 13 before. Cancellations fell to 1.8% of scheduled stops from 2.8%, which is 1.0 percentage points fewer.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,170 | 86.5% | 1.3% |
| Period 6 of 2026-27 | 2,103 | 85.9% | 1.9% |
| Period 5 of 2026-27 | 2,209 | 85.3% | 2.4% |
| Period 4 of 2026-27 | 2,100 | 89.1% | 1.7% |
| Period 3 of 2026-27 | 2,171 | 82.7% | 3.4% |
| Period 2 of 2026-27 | 2,130 | 84.0% | 3.1% |
| Period 1 of 2026-27 | 2,424 | 90.3% | 1.9% |
| Period 13 of 2025-26 | 2,266 | 87.9% | 1.5% |
| Period 12 of 2025-26 | 1,358 | 83.9% | 0.7% |
| Period 11 of 2025-26 | 2,115 | 86.8% | 1.7% |
| Period 10 of 2025-26 | 1,960 | 89.1% | 1.0% |
| Period 9 of 2025-26 | 2,061 | 82.2% | 1.9% |
| Period 8 of 2025-26 | 2,173 | 83.7% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Swanscombe
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,652 | 83.3% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out