GTR at Swanscombe
How this operator is doing here
GTR had 25,652 scheduled stops at Swanscombe in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 83.3% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
GTR trains at Swanscombe also serve Northfleet (0.9 km east, 83.2% on time, 5.1% cancelled), Greenhithe for Bluewater (2.2 km west, 83.4% on time, 5.1% cancelled), Stone Crossing (3.3 km west, 82.6% on time, 5.1% cancelled), Gravesend (3.9 km east, 82.4% on time, 4.7% cancelled), Dartford (6.4 km west, 78.2% on time, 5.0% cancelled) and Slade Green (8.7 km west, 84.9% on time, 6.4% cancelled), which are the stations on its network closest to Swanscombe.
Within 30 km of here, GTR runs best at Beckenham Junction, 23.8 km west (98.1%), and worst at City Thameslink, 29.7 km west (77.2%).
The busiest GTR station within 30 km of Swanscombe is East Croydon, 29.2 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Swanscombe, GTR is the least punctual, at 83.3%.
For GTR, Swanscombe ranks 162nd of 307 stations and is typical: 83.3% here against 82.9% across the network, a difference of 0.4 percentage points.
GTR at Swanscombe has not moved in one direction over three full railway years: 86.4% within three minutes in 2023-24, 81.6% in 2024-25 and 84.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,155 | 82.6% | 4.5% |
| Period 6 of 2026-27 | 1,965 | 80.7% | 4.8% |
| Period 5 of 2026-27 | 1,651 | 84.0% | 6.2% |
| Period 4 of 2026-27 | 1,959 | 83.1% | 4.1% |
| Period 3 of 2026-27 | 1,676 | 81.3% | 5.0% |
| Period 2 of 2026-27 | 2,048 | 83.8% | 4.5% |
| Period 1 of 2026-27 | 2,325 | 86.9% | 3.9% |
| Period 13 of 2025-26 | 2,257 | 86.9% | 2.0% |
| Period 12 of 2025-26 | 1,348 | 80.4% | 3.2% |
| Period 11 of 2025-26 | 2,087 | 83.5% | 4.5% |
| Period 10 of 2025-26 | 1,977 | 87.8% | 9.7% |
| Period 9 of 2025-26 | 2,052 | 78.9% | 9.1% |
| Period 8 of 2025-26 | 2,152 | 81.2% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Swanscombe
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 27,240 | 86.1% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out