Southeastern at Swanley
How this operator is doing here
Southeastern had 48,822 scheduled stops at Swanley in the 13 periods to Period 7 of 2026-27, 65% of the station's total. 82.4% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Southeastern trains at Swanley also serve Eynsford (4.2 km south-east, 94.3% on time, 0.0% cancelled), St Mary Cray (4.3 km west, 81.7% on time, 1.3% cancelled), Farningham Road (4.8 km east, 85.1% on time, 1.6% cancelled), Bexley (5.5 km north, 87.1% on time, 1.4% cancelled), Albany Park (5.6 km north-west, 89.0% on time, 1.4% cancelled) and Chelsfield (5.7 km south-west, 80.2% on time, 1.4% cancelled), which are the stations on its network closest to Swanley.
Within 30 km of here, Southeastern runs best at Sundridge Park, 10.4 km west (99.4%), and worst at Hildenborough, 20.2 km south (70.3%).
The busiest Southeastern station within 30 km of Swanley is London Bridge, 21.5 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Swanley, Southeastern is the least punctual, at 82.4%.
For Southeastern, Swanley is the 92nd best of 173 ranked stations. Its 82.4% here is 1.8 percentage points below the 84.2% across the whole network.
Southeastern at Swanley has slipped a little, from 84.2% within three minutes in the previous 13 periods to 82.4% in the latest 13, a fall of 1.8 percentage points. Cancellations held steady at 1.3% of scheduled stops, against 1.6% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,818 | 76.2% | 1.2% |
| Period 6 of 2026-27 | 3,757 | 76.4% | 1.8% |
| Period 5 of 2026-27 | 3,912 | 79.4% | 2.1% |
| Period 4 of 2026-27 | 3,929 | 85.0% | 1.4% |
| Period 3 of 2026-27 | 3,834 | 81.7% | 2.7% |
| Period 2 of 2026-27 | 3,780 | 83.5% | 1.1% |
| Period 1 of 2026-27 | 4,180 | 89.9% | 0.5% |
| Period 13 of 2025-26 | 3,993 | 88.3% | 0.8% |
| Period 12 of 2025-26 | 3,695 | 86.8% | 0.9% |
| Period 11 of 2025-26 | 3,722 | 85.3% | 1.5% |
| Period 10 of 2025-26 | 3,060 | 84.5% | 1.1% |
| Period 9 of 2025-26 | 3,541 | 75.5% | 1.4% |
| Period 8 of 2025-26 | 3,601 | 77.1% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Swanley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,932 | 88.0% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out