GTR at Swanley
How this operator is doing here
GTR had 25,932 scheduled stops at Swanley in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 88.0% of recorded arrivals came within three minutes and 3.0% of stops were cancelled.
GTR trains at Swanley also serve Eynsford (4.2 km south-east, 89.8% on time, 3.1% cancelled), St Mary Cray (4.3 km west, 91.1% on time, 3.0% cancelled), Orpington (5.9 km west, 81.0% on time, 5.9% cancelled), Petts Wood (6.5 km west, 84.3% on time, 5.8% cancelled), Shoreham (Kent) (6.9 km south, 91.3% on time, 3.1% cancelled) and Dartford (7.1 km north-east, 78.2% on time, 5.0% cancelled), which are the stations on its network closest to Swanley.
Within 30 km of here, GTR runs best at Beckenham Junction, 13.6 km west (98.1%), and worst at Kenley, 20.1 km west (66.9%).
The busiest GTR station within 30 km of Swanley is East Croydon, 18.2 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Swanley, GTR is the most punctual, at 88.0%.
For GTR, Swanley is the 88th best of 307 ranked stations. Its 88.0% here is 5.1 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Swanley are near its usual level: 3.0% of scheduled stops, against 4.7% across its network and 1.9% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,987 | 81.7% | 1.6% |
| Period 6 of 2026-27 | 1,889 | 80.3% | 4.1% |
| Period 5 of 2026-27 | 2,060 | 87.4% | 3.4% |
| Period 4 of 2026-27 | 2,056 | 88.6% | 3.6% |
| Period 3 of 2026-27 | 1,858 | 88.5% | 3.7% |
| Period 2 of 2026-27 | 1,915 | 90.8% | 3.5% |
| Period 1 of 2026-27 | 2,142 | 93.3% | 1.0% |
| Period 13 of 2025-26 | 2,173 | 91.0% | 2.9% |
| Period 12 of 2025-26 | 2,059 | 91.1% | 1.8% |
| Period 11 of 2025-26 | 2,020 | 90.2% | 1.9% |
| Period 10 of 2025-26 | 1,789 | 88.7% | 3.6% |
| Period 9 of 2025-26 | 1,930 | 83.8% | 4.4% |
| Period 8 of 2025-26 | 2,054 | 87.1% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Swanley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 48,822 | 82.4% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out