Sunnymeads
SNYSouth EastManaged by South Western Railway
How this station is performing
Sunnymeads had 24,537 scheduled stops to Period 7 of 2026-27, about 67 a day. 90.4% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Sunnymeads opened on 10 July 1927, 99 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sunnymeads is the newest; the oldest, Langley (Berks), opened in 1846.
The nearest stations to Sunnymeads are Wraysbury (1.8 km south-east), Datchet (2.0 km north-west), Windsor and Eton Riverside (3.7 km north-west), Windsor and Eton Central (3.9 km west) and Langley (Berks) (4.4 km north). 18 stations lie within 10 km in all. Of the five, Windsor and Eton Central is the most punctual at 99.0% and Langley (Berks) the least at 84.5%, with Sunnymeads on 90.4%.
Sunnymeads takes its name from a Village called Sunnymeads, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Sunnymeads was Period 9 of 2024-25, at 76.2%, some time before the latest year. The strongest was Period 7 of 2026-27, at 93.9%, and the two are 17.7 percentage points apart. Cancellations peaked at 9.6% of scheduled stops in Period 11 of 2023-24, against 2.7% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Sunnymeads on 90.4%. The comparison group includes Wraysbury (91.9%), Dorking (Deepdene) (77.8%) and Snodland (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,537 | 90.4% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Sunnymeads? Delay Repay
These operators call at Sunnymeads and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,668 | 93.9% | 1.1% |
| Period 6 of 2026-27 | 1,921 | 92.1% | 3.0% |
| Period 5 of 2026-27 | 1,919 | 90.6% | 3.8% |
| Period 4 of 2026-27 | 1,886 | 91.3% | 1.9% |
| Period 3 of 2026-27 | 1,869 | 89.9% | 1.9% |
| Period 2 of 2026-27 | 1,989 | 91.2% | 6.6% |
| Period 1 of 2026-27 | 2,182 | 92.9% | 2.8% |
| Period 13 of 2025-26 | 2,063 | 91.9% | 0.8% |
| Period 12 of 2025-26 | 1,945 | 89.3% | 2.6% |
| Period 11 of 2025-26 | 1,948 | 89.8% | 0.6% |
| Period 10 of 2025-26 | 1,784 | 89.9% | 2.2% |
| Period 9 of 2025-26 | 1,885 | 83.1% | 2.1% |
| Period 8 of 2025-26 | 1,478 | 86.3% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wraysbury | 24,538 | 91.9% | 2.5% |
| Dorking (Deepdene) | 24,608 | 77.8% | 6.1% |
| Snodland | 24,764 | 94.1% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out