Snodland
SDASouth EastManaged by Southeastern
How this station is performing
Snodland had 24,764 scheduled stops to Period 7 of 2026-27, about 68 a day. 94.1% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Snodland opened on 18 June 1856, 170 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Snodland is the oldest; the next oldest, Aylesford, dates from 1856.
The nearest stations to Snodland are New Hythe (2.1 km south), Halling (2.4 km north), Aylesford (3.5 km south), West Malling (4.8 km south-west) and Cuxton (4.9 km north). 18 stations lie within 10 km in all. Of the five, New Hythe is the most punctual at 95.2% and West Malling the least at 74.8%, with Snodland on 94.1%.
Snodland takes its name from a town called Snodland, home to about 11,830 people, and the station stands 0.3 km from its centre.
In South East, Snodland ranks 32nd of 409 ranked stations. Its 94.1% is 12.9 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, Snodland is the least punctual, at 94.1%. All of them are ahead, including Bagshot (97.0%), Camberley (95.9%) and Frimley (96.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 24,764 | 94.1% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Snodland? Delay Repay
These operators call at Snodland and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,948 | 93.9% | 1.2% |
| Period 6 of 2026-27 | 1,879 | 94.6% | 1.4% |
| Period 5 of 2026-27 | 1,854 | 94.5% | 2.9% |
| Period 4 of 2026-27 | 1,948 | 95.2% | 1.4% |
| Period 3 of 2026-27 | 1,888 | 92.4% | 2.2% |
| Period 2 of 2026-27 | 1,838 | 94.3% | 1.6% |
| Period 1 of 2026-27 | 2,195 | 97.2% | 0.9% |
| Period 13 of 2025-26 | 2,042 | 95.4% | 2.3% |
| Period 12 of 2025-26 | 1,888 | 94.6% | 0.7% |
| Period 11 of 2025-26 | 1,916 | 94.8% | 1.5% |
| Period 10 of 2025-26 | 1,600 | 93.7% | 1.1% |
| Period 9 of 2025-26 | 1,820 | 89.7% | 3.9% |
| Period 8 of 2025-26 | 1,948 | 91.5% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out