Sudbury Hill Harrow
SDHLondonManaged by Chiltern Railways
How this station is performing
Sudbury Hill Harrow had 7,660 scheduled stops to Period 7 of 2026-27, about 21 a day. 90.2% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Sudbury Hill Harrow opened on 1 March 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Greenford is the oldest (1904) and South Kenton the newest (1933), with Sudbury Hill Harrow in between.
The nearest stations to Sudbury Hill Harrow are Sudbury and Harrow Road (1.4 km east), Northolt Park (1.6 km west), Greenford (1.9 km south), North Wembley (2.3 km east) and South Kenton (2.3 km north-east). 46 stations lie within 10 km in all. Of the five, Greenford is the most punctual at 96.8% and North Wembley the least at 88.1%, with Sudbury Hill Harrow on 90.2%.
Sudbury Hill Harrow is named after Sudbury Hill, an area of London, but the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Sudbury Hill Harrow was Period 7 of 2024-25, at 87.2%, some time before the latest year. The strongest was Period 4 of 2023-24, at 96.7%, and the two are 9.5 percentage points apart. Cancellations peaked at 11.7% of scheduled stops in Period 7 of 2023-24, against 3.0% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 7,660 | 90.2% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Sudbury Hill Harrow? Delay Repay
These operators call at Sudbury Hill Harrow and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 617 | 87.4% | 2.3% |
| Period 6 of 2026-27 | 587 | 87.4% | 2.4% |
| Period 5 of 2026-27 | 608 | 88.3% | 2.6% |
| Period 4 of 2026-27 | 612 | 89.0% | 3.8% |
| Period 3 of 2026-27 | 508 | 89.1% | 3.9% |
| Period 2 of 2026-27 | 558 | 87.5% | 2.7% |
| Period 1 of 2026-27 | 642 | 91.9% | 1.4% |
| Period 13 of 2025-26 | 680 | 93.4% | 4.6% |
| Period 12 of 2025-26 | 620 | 92.2% | 1.0% |
| Period 11 of 2025-26 | 589 | 91.2% | 1.7% |
| Period 10 of 2025-26 | 400 | 92.4% | 4.0% |
| Period 9 of 2025-26 | 619 | 91.1% | 5.8% |
| Period 8 of 2025-26 | 620 | 91.2% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Ruislip | 15,103 | 88.4% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out