Southeastern had 47,958 scheduled stops at Strood (Kent) in the 13 periods to Period 7 of 2026-27, 65% of the station's total. 87.8% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at Strood (Kent) also serve Rochester (1.0 km south-east, 77.4% on time, 1.7% cancelled), Chatham (2.3 km south-east, 77.2% on time, 1.8% cancelled), Cuxton (3.7 km south-west, 94.1% on time, 1.6% cancelled), Gillingham (Kent) (3.7 km east, 77.4% on time, 1.4% cancelled), Higham (4.1 km north-west, 79.5% on time, 1.8% cancelled) and Halling (6.2 km south-west, 95.0% on time, 1.6% cancelled), which are the stations on its network closest to Strood (Kent).
Within 30 km of here, Southeastern runs best at Yalding, 19.9 km south (95.3%), and worst at Teynham, 22.4 km east (67.8%).
The busiest Southeastern station within 30 km of Strood (Kent) is Orpington, 28.7 km west, with about 344 scheduled stops a day.
Of the 2 operators with enough records at Strood (Kent), Southeastern is the most punctual, at 87.8%.
For Southeastern, Strood (Kent) is the 49th best of 173 ranked stations. Its 87.8% here is 3.6 percentage points above the 84.2% across the whole network.
Southeastern at Strood (Kent) has not moved in one direction over three full railway years: 91.6% within three minutes in 2023-24, 89.1% in 2024-25 and 89.6% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,847 | 86.5% | 1.4% |
| Period 6 of 2026-27 | 3,745 | 85.9% | 1.5% |
| Period 5 of 2026-27 | 3,661 | 86.5% | 2.3% |
| Period 4 of 2026-27 | 3,783 | 89.1% | 1.7% |
| Period 3 of 2026-27 | 3,742 | 82.3% | 2.4% |
| Period 2 of 2026-27 | 3,593 | 87.6% | 2.4% |
| Period 1 of 2026-27 | 4,141 | 91.5% | 0.7% |
| Period 13 of 2025-26 | 4,047 | 89.8% | 2.3% |
| Period 12 of 2025-26 | 3,616 | 91.0% | 0.6% |
| Period 11 of 2025-26 | 3,776 | 90.9% | 1.2% |
| Period 10 of 2025-26 | 2,931 | 89.9% | 1.0% |
| Period 9 of 2025-26 | 3,429 | 84.0% | 1.6% |
| Period 8 of 2025-26 | 3,647 | 86.3% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Strood (Kent)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,129 | 83.8% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out