GTR at Strood (Kent)
How this operator is doing here
GTR had 26,129 scheduled stops at Strood (Kent) in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 83.8% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
GTR trains at Strood (Kent) also serve Rochester (1.0 km south-east, 80.5% on time, 4.9% cancelled), Chatham (2.3 km south-east, 84.5% on time, 5.0% cancelled), Gillingham (Kent) (3.7 km east, 81.6% on time, 5.8% cancelled), Higham (4.1 km north-west, 84.5% on time, 4.8% cancelled), Rainham (Kent) (8.4 km south-east, 80.6% on time, 7.2% cancelled) and Gravesend (10.5 km north-west, 82.4% on time, 4.7% cancelled), which are the stations on its network closest to Strood (Kent).
Within 30 km of here, GTR runs best at Bat and Ball, 24.4 km south-west (91.9%), and worst at Dartford, 20.3 km west (78.2%).
The busiest GTR station within 30 km of Strood (Kent) is Gravesend, 10.5 km north-west, with about 73 scheduled stops a day.
Of the 2 operators with enough records at Strood (Kent), GTR is the least punctual, at 83.8%.
For GTR, Strood (Kent) is the 154th best of 307 ranked stations. Its 83.8% here is 0.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,075 | 81.8% | 4.3% |
| Period 6 of 2026-27 | 2,049 | 80.1% | 4.7% |
| Period 5 of 2026-27 | 1,624 | 83.1% | 6.0% |
| Period 4 of 2026-27 | 2,011 | 83.2% | 3.9% |
| Period 3 of 2026-27 | 1,667 | 83.4% | 4.8% |
| Period 2 of 2026-27 | 1,961 | 83.9% | 4.6% |
| Period 1 of 2026-27 | 2,388 | 86.3% | 3.8% |
| Period 13 of 2025-26 | 2,247 | 87.9% | 2.1% |
| Period 12 of 2025-26 | 2,005 | 87.4% | 2.5% |
| Period 11 of 2025-26 | 1,956 | 83.1% | 5.0% |
| Period 10 of 2025-26 | 1,981 | 85.2% | 8.8% |
| Period 9 of 2025-26 | 2,105 | 80.1% | 8.3% |
| Period 8 of 2025-26 | 2,060 | 82.2% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Strood (Kent)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 47,958 | 87.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out