Chiltern Railways at Stratford-upon-Avon
All trains at Stratford-upon-AvonChiltern Railways across BritainWest Midlands
How this operator is doing here
Chiltern Railways had 5,392 scheduled stops at Stratford-upon-Avon in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 92.3% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
Chiltern Railways trains at Stratford-upon-Avon also serve Stratford-upon-Avon Parkway (1.6 km north-west, 92.7% on time, 1.2% cancelled), Wilmcote (4.1 km north-west, 91.0% on time, 1.2% cancelled), Bearley (6.0 km north, 90.4% on time, 1.1% cancelled), Claverdon (9.2 km north, 90.1% on time, 1.1% cancelled), Hatton (11.5 km north, 85.2% on time, 1.2% cancelled) and Warwick Parkway (12.4 km north-east, 82.7% on time, 1.1% cancelled), which are the stations on its network closest to Stratford-upon-Avon.
Within 30 km of here, Chiltern Railways runs best at Stratford-upon-Avon Parkway, 1.6 km north-west (92.7%), and worst at Lapworth, 16.3 km north (82.4%).
The busiest Chiltern Railways station within 30 km of Stratford-upon-Avon is Leamington Spa, 15.8 km north-east, with about 81 scheduled stops a day.
Of the 2 operators with enough records at Stratford-upon-Avon, Chiltern Railways is the most punctual, at 92.3%.
For Chiltern Railways, Stratford-upon-Avon is the 8th best of 51 ranked stations. Its 92.3% here is 4.6 percentage points above the 87.7% across the whole network.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 403 | 90.0% | 0.2% |
| Period 6 of 2026-27 | 444 | 92.2% | 1.6% |
| Period 5 of 2026-27 | 442 | 88.9% | 0.0% |
| Period 4 of 2026-27 | 444 | 89.2% | 1.8% |
| Period 3 of 2026-27 | 399 | 91.4% | 1.0% |
| Period 2 of 2026-27 | 429 | 90.6% | 3.7% |
| Period 1 of 2026-27 | 416 | 96.4% | 0.0% |
| Period 13 of 2025-26 | 489 | 95.1% | 0.6% |
| Period 12 of 2025-26 | 444 | 96.1% | 1.6% |
| Period 11 of 2025-26 | 394 | 95.9% | 1.3% |
| Period 10 of 2025-26 | 280 | 94.6% | 0.7% |
| Period 9 of 2025-26 | 427 | 91.1% | 0.5% |
| Period 8 of 2025-26 | 381 | 89.1% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stratford-upon-Avon
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 20,343 | 90.3% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out