Chiltern Railways at Stratford-upon-Avon Parkway
All trains at Stratford-upon-Avon ParkwayChiltern Railways across BritainWest Midlands
How this operator is doing here
Chiltern Railways had 5,068 scheduled stops at Stratford-upon-Avon Parkway in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 92.7% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
Chiltern Railways trains at Stratford-upon-Avon Parkway also serve Stratford-upon-Avon (1.6 km south-east, 92.3% on time, 1.1% cancelled), Wilmcote (2.5 km north-west, 91.0% on time, 1.2% cancelled), Bearley (4.5 km north, 90.4% on time, 1.1% cancelled), Claverdon (8.2 km north, 90.1% on time, 1.1% cancelled), Hatton (10.6 km north, 85.2% on time, 1.2% cancelled) and Warwick Parkway (12.0 km north-east, 82.7% on time, 1.1% cancelled), which are the stations on its network closest to Stratford-upon-Avon Parkway.
Within 30 km of here, Chiltern Railways runs best at Stratford-upon-Avon, 1.6 km south-east (92.3%), and worst at Lapworth, 15.1 km north (82.4%).
The busiest Chiltern Railways station within 30 km of Stratford-upon-Avon Parkway is Leamington Spa, 15.9 km north-east, with about 81 scheduled stops a day.
Chiltern Railways at Stratford-upon-Avon Parkway has slipped a little, from 96.5% within three minutes in the previous 13 periods to 92.7% in the latest 13, a fall of 3.8 percentage points. Cancellations fell to 1.2% of scheduled stops from 1.7%, which is 0.5 percentage points fewer.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 381 | 90.3% | 0.3% |
| Period 6 of 2026-27 | 420 | 91.5% | 1.7% |
| Period 5 of 2026-27 | 418 | 90.8% | 0.0% |
| Period 4 of 2026-27 | 420 | 88.9% | 1.9% |
| Period 3 of 2026-27 | 347 | 92.1% | 1.2% |
| Period 2 of 2026-27 | 406 | 89.6% | 3.9% |
| Period 1 of 2026-27 | 393 | 97.2% | 0.0% |
| Period 13 of 2025-26 | 463 | 94.8% | 0.6% |
| Period 12 of 2025-26 | 420 | 95.9% | 1.7% |
| Period 11 of 2025-26 | 371 | 95.0% | 1.1% |
| Period 10 of 2025-26 | 266 | 93.8% | 0.8% |
| Period 9 of 2025-26 | 404 | 91.9% | 0.5% |
| Period 8 of 2025-26 | 359 | 95.3% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stratford-upon-Avon Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 20,164 | 89.1% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out