Elizabeth line at Stratford (London)
All trains at Stratford (London)Elizabeth line across BritainLondon
How this operator is doing here
Elizabeth line had 120,403 scheduled stops at Stratford (London) in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 89.5% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Elizabeth line trains at Stratford (London) also serve Maryland (0.8 km north-east, 89.8% on time, 2.4% cancelled), Forest Gate (2.1 km north-east, 89.8% on time, 2.4% cancelled), Manor Park (3.6 km east, 89.5% on time, 2.5% cancelled), Canary Wharf (4.0 km south, 93.9% on time, 2.4% cancelled), Custom House (4.1 km south-east, 93.8% on time, 2.5% cancelled) and Whitechapel (4.6 km south-west, 92.2% on time, 2.6% cancelled), which are the stations on its network closest to Stratford (London).
Within 30 km of here, Elizabeth line runs best at Abbey Wood, 10.3 km south-east (94.9%), and worst at Ealing Broadway, 20.8 km west (82.9%).
The busiest Elizabeth line station within 30 km of Stratford (London) is London Paddington, 12.3 km west, with about 644 scheduled stops a day.
Elizabeth line ranks 2nd of the 4 operators with enough records at Stratford (London), on 89.5%.
For Elizabeth line, Stratford (London) ranks 17th of 41 stations and is typical: 89.5% here against 89.6% across the network, a difference of 0.1 percentage points.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,306 | 92.5% | 1.8% |
| Period 6 of 2026-27 | 9,223 | 88.8% | 2.7% |
| Period 5 of 2026-27 | 9,308 | 86.9% | 4.9% |
| Period 4 of 2026-27 | 9,142 | 89.5% | 3.0% |
| Period 3 of 2026-27 | 9,250 | 89.2% | 3.1% |
| Period 2 of 2026-27 | 9,167 | 91.9% | 2.0% |
| Period 1 of 2026-27 | 10,577 | 89.4% | 2.0% |
| Period 13 of 2025-26 | 9,479 | 89.3% | 2.9% |
| Period 12 of 2025-26 | 9,306 | 92.1% | 0.8% |
| Period 11 of 2025-26 | 9,309 | 89.1% | 1.6% |
| Period 10 of 2025-26 | 8,253 | 91.3% | 1.7% |
| Period 9 of 2025-26 | 8,919 | 87.0% | 2.2% |
| Period 8 of 2025-26 | 9,164 | 86.0% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stratford (London)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 155,539 | 91.2% | 2.3% |
| London Overground | 106,194 | 85.2% | 9.4% |
| c2c | 7,773 | 85.7% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out