c2c at Stratford (London)
How this operator is doing here
c2c had 7,773 scheduled stops at Stratford (London) in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 85.7% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
c2c trains at Stratford (London) also serve West Ham (1.6 km south, 90.9% on time, 2.1% cancelled), Woodgrange Park (3.5 km east, – on time, – cancelled), Limehouse (4.0 km south-west, 91.0% on time, 2.0% cancelled), Barking (5.7 km east, 91.6% on time, 2.0% cancelled), London Liverpool Street (6.0 km south-west, 85.5% on time, 5.3% cancelled) and London Fenchurch Street (6.1 km south-west, 88.3% on time, 1.8% cancelled), which are the stations on its network closest to Stratford (London).
Within 30 km of here, c2c runs best at Dagenham Dock, 10.4 km east (92.5%), and worst at London Liverpool Street, 6.0 km south-west (85.5%).
The busiest c2c station within 30 km of Stratford (London) is Barking, 5.7 km east, with about 293 scheduled stops a day.
c2c at Stratford (London) has slipped a little, from 89.0% within three minutes in the previous 13 periods to 85.7% in the latest 13, a fall of 3.3 percentage points. Cancellations rose to 5.0% of scheduled stops from 2.2%, which is 2.8 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 466 | 87.8% | 1.5% |
| Period 6 of 2026-27 | 408 | 79.0% | 2.9% |
| Period 5 of 2026-27 | 577 | 82.1% | 10.9% |
| Period 4 of 2026-27 | 685 | 81.3% | 21.3% |
| Period 3 of 2026-27 | 370 | 79.0% | 8.6% |
| Period 2 of 2026-27 | 1,013 | 90.6% | 2.7% |
| Period 1 of 2026-27 | 1,756 | 85.2% | 2.1% |
| Period 13 of 2025-26 | 243 | 87.1% | 0.8% |
| Period 12 of 2025-26 | 420 | 92.6% | 0.5% |
| Period 11 of 2025-26 | 570 | 89.1% | 2.1% |
| Period 10 of 2025-26 | 314 | 78.2% | 0.6% |
| Period 9 of 2025-26 | 264 | 92.2% | 2.7% |
| Period 8 of 2025-26 | 687 | 85.6% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stratford (London)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 155,539 | 91.2% | 2.3% |
| Elizabeth line | 120,403 | 89.5% | 2.3% |
| London Overground | 106,194 | 85.2% | 9.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out