Stoneleigh
SNLSouth EastManaged by South Western Railway
How this station is performing
Stoneleigh had 28,592 scheduled stops to Period 7 of 2026-27, about 78 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Stoneleigh opened on 17 July 1932, 94 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ewell East is the oldest (1847) and Malden Manor the newest (1938), with Stoneleigh in between.
The nearest stations to Stoneleigh are Ewell West (1.7 km south-west), Worcester Park (2.0 km north), Ewell East (2.1 km south), Cheam (2.4 km east) and Malden Manor (2.5 km north). 58 stations lie within 10 km in all. Of the five, Cheam is the most punctual at 92.1% and Ewell West the least at 83.0%, with Stoneleigh on 83.5%.
Stoneleigh is one of 2 stations named after a settlement called Stoneleigh, home to about 8,741 people; this one stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Stoneleigh was Period 9 of 2024-25, at 70.8%, some time before the latest year. The strongest was Period 2 of 2023-24, at 96.2%, and the two are 25.4 percentage points apart.
Compared with 3 stations of a similar size in South East, Stoneleigh is the most punctual, at 83.5%. The comparison group includes Ewell West (83.0%), Esher (80.1%) and Hersham (80.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 28,592 | 83.5% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Stoneleigh? Delay Repay
These operators call at Stoneleigh and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,239 | 88.5% | 3.3% |
| Period 6 of 2026-27 | 2,222 | 85.2% | 2.7% |
| Period 5 of 2026-27 | 2,240 | 86.4% | 3.4% |
| Period 4 of 2026-27 | 2,241 | 85.6% | 1.3% |
| Period 3 of 2026-27 | 2,114 | 86.0% | 4.6% |
| Period 2 of 2026-27 | 2,220 | 80.4% | 5.9% |
| Period 1 of 2026-27 | 2,476 | 86.4% | 3.2% |
| Period 13 of 2025-26 | 2,194 | 86.9% | 1.5% |
| Period 12 of 2025-26 | 2,143 | 81.2% | 3.5% |
| Period 11 of 2025-26 | 2,179 | 81.1% | 1.8% |
| Period 10 of 2025-26 | 1,840 | 82.1% | 4.7% |
| Period 9 of 2025-26 | 2,242 | 75.3% | 2.8% |
| Period 8 of 2025-26 | 2,242 | 78.9% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ewell West | 28,592 | 83.0% | 3.4% |
| Esher | 28,642 | 80.1% | 3.2% |
| Hersham | 28,289 | 80.4% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out