Esher
ESHSouth EastManaged by South Western Railway
How this station is performing
Esher had 28,642 scheduled stops to Period 7 of 2026-27, about 79 a day. 80.1% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Esher opened on 21 May 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Esher is the oldest; the next oldest, Hampton Court, dates from 1849.
The nearest stations to Esher are Hinchley Wood (1.0 km south-east), Thames Ditton (1.4 km north-east), Claygate (2.2 km south), Hampton Court (2.5 km north) and Hersham (2.5 km west). 45 stations lie within 10 km in all. At 80.1%, Esher is less punctual than all of them; the best of the five, Thames Ditton, manages 88.5%.
Esher takes its name from a town called Esher, home to about 50,904 people, and the station stands 1.5 km from its centre.
Across the whole run of data, the weakest four-week period for Esher was Period 9 of 2024-25, at 59.2%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.0%, and the two are 33.8 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 2 of 2026-27, against 3.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Esher is the least punctual, at 80.1%. All of them are ahead, including Ewell West (83.0%), Stoneleigh (83.5%) and Hersham (80.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 28,642 | 80.1% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Esher? Delay Repay
These operators call at Esher and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,133 | 83.4% | 1.9% |
| Period 6 of 2026-27 | 2,194 | 86.9% | 1.5% |
| Period 5 of 2026-27 | 2,279 | 82.5% | 3.9% |
| Period 4 of 2026-27 | 2,294 | 82.1% | 3.4% |
| Period 3 of 2026-27 | 2,107 | 80.3% | 3.5% |
| Period 2 of 2026-27 | 2,237 | 77.1% | 6.9% |
| Period 1 of 2026-27 | 2,553 | 85.1% | 2.4% |
| Period 13 of 2025-26 | 2,161 | 85.1% | 1.6% |
| Period 12 of 2025-26 | 2,200 | 80.6% | 4.0% |
| Period 11 of 2025-26 | 2,201 | 82.5% | 1.0% |
| Period 10 of 2025-26 | 1,919 | 78.0% | 4.5% |
| Period 9 of 2025-26 | 2,164 | 66.1% | 2.1% |
| Period 8 of 2025-26 | 2,200 | 69.4% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ewell West | 28,592 | 83.0% | 3.4% |
| Stoneleigh | 28,592 | 83.5% | 3.4% |
| Hersham | 28,289 | 80.4% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out