Selling
SEGSouth EastManaged by Southeastern
How this station is performing
Selling had 16,855 scheduled stops to Period 7 of 2026-27, about 46 a day. 73.1% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Selling opened on 1 August 1860, 166 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Selling is the newest; the oldest, Chilham, opened in 1846.
The nearest stations to Selling are Chilham (4.4 km south-east), Faversham (5.1 km north-west), Chartham (5.8 km south-east), Canterbury West (9.3 km east) and Canterbury East (9.4 km east). 5 stations lie within 10 km in all. Of the five, Chartham is the most punctual at 80.9% and Faversham the least at 70.7%, with Selling on 73.1%.
Selling takes its name from a Village called Selling, home to about 864 people, and the station stands 1.5 km from its centre.
Across the whole run of data, the weakest four-week period for Selling was Period 9 of 2024-25, at 50.4%, some time before the latest year. The strongest was Period 1 of 2025-26, at 82.8%, and the two are 32.4 percentage points apart. Cancellations peaked at 6.1% of scheduled stops in Period 4 of 2025-26, against 1.7% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Selling on 73.1%. The comparison group includes Newington (69.0%), West St Leonards (76.9%) and Stonegate (70.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 16,855 | 73.1% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Selling? Delay Repay
These operators call at Selling and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,306 | 73.1% | 1.3% |
| Period 6 of 2026-27 | 1,281 | 72.3% | 2.0% |
| Period 5 of 2026-27 | 1,300 | 68.3% | 1.2% |
| Period 4 of 2026-27 | 1,301 | 75.1% | 1.6% |
| Period 3 of 2026-27 | 1,298 | 69.4% | 2.5% |
| Period 2 of 2026-27 | 1,242 | 72.1% | 1.5% |
| Period 1 of 2026-27 | 1,468 | 80.0% | 1.9% |
| Period 13 of 2025-26 | 1,437 | 77.0% | 2.2% |
| Period 12 of 2025-26 | 1,264 | 76.3% | 0.9% |
| Period 11 of 2025-26 | 1,307 | 78.8% | 1.5% |
| Period 10 of 2025-26 | 1,080 | 68.2% | 1.9% |
| Period 9 of 2025-26 | 1,297 | 67.6% | 1.9% |
| Period 8 of 2025-26 | 1,274 | 69.3% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Newington | 16,838 | 69.0% | 1.7% |
| West St Leonards | 16,895 | 76.9% | 1.9% |
| Stonegate | 16,805 | 70.9% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out