GTR at Stone Crossing
How this operator is doing here
GTR had 25,652 scheduled stops at Stone Crossing in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 82.6% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
GTR trains at Stone Crossing also serve Greenhithe for Bluewater (1.1 km east, 83.4% on time, 5.1% cancelled), Dartford (3.1 km west, 78.2% on time, 5.0% cancelled), Swanscombe (3.3 km east, 83.3% on time, 5.1% cancelled), Northfleet (4.2 km east, 83.2% on time, 5.1% cancelled), Slade Green (5.4 km west, 84.9% on time, 6.4% cancelled) and Gravesend (7.3 km east, 82.4% on time, 4.7% cancelled), which are the stations on its network closest to Stone Crossing.
Within 30 km of here, GTR runs best at Beckenham Junction, 20.6 km west (98.1%), and worst at Kenley, 29.0 km south-west (66.9%).
The busiest GTR station within 30 km of Stone Crossing is East Croydon, 26.1 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Stone Crossing, GTR is the least punctual, at 82.6%.
For GTR, Stone Crossing ranks 175th of 307 stations and is typical: 82.6% here against 82.9% across the network, a difference of 0.3 percentage points.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,155 | 81.5% | 4.5% |
| Period 6 of 2026-27 | 1,965 | 79.4% | 4.8% |
| Period 5 of 2026-27 | 1,651 | 83.2% | 6.3% |
| Period 4 of 2026-27 | 1,959 | 83.0% | 4.1% |
| Period 3 of 2026-27 | 1,676 | 81.9% | 5.0% |
| Period 2 of 2026-27 | 2,048 | 83.0% | 4.5% |
| Period 1 of 2026-27 | 2,325 | 86.1% | 3.9% |
| Period 13 of 2025-26 | 2,257 | 85.8% | 2.0% |
| Period 12 of 2025-26 | 1,348 | 79.3% | 3.2% |
| Period 11 of 2025-26 | 2,087 | 82.5% | 4.5% |
| Period 10 of 2025-26 | 1,977 | 86.7% | 9.7% |
| Period 9 of 2025-26 | 2,052 | 78.7% | 9.1% |
| Period 8 of 2025-26 | 2,152 | 80.6% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stone Crossing
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 27,470 | 86.6% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out