CrossCountry at Stoke-on-Trent
All trains at Stoke-on-TrentCrossCountry across BritainWest Midlands
How this operator is doing here
CrossCountry had 20,636 scheduled stops at Stoke-on-Trent in the 13 periods to Period 7 of 2026-27, 27% of the station's total. 59.4% of recorded arrivals came within three minutes and 5.8% of stops were cancelled.
CrossCountry trains at Stoke-on-Trent also serve Crewe (19.1 km north-west, 64.1% on time, 4.1% cancelled), Stafford (23.1 km south, 59.1% on time, 4.9% cancelled), Macclesfield (28.2 km north, 57.8% on time, 6.8% cancelled), Penkridge (31.9 km south, – on time, – cancelled), Bramhall (39.2 km north, – on time, – cancelled) and Cheadle Hulme (40.9 km north, – on time, – cancelled), which are the stations on its network closest to Stoke-on-Trent.
The busiest CrossCountry station within 30 km of Stoke-on-Trent is Stafford, 23.1 km south, with about 58 scheduled stops a day.
CrossCountry ranks 4th of the 5 operators with enough records at Stoke-on-Trent, on 59.4%.
For CrossCountry, Stoke-on-Trent is the 65th best of 99 ranked stations. Its 59.4% here is 3.8 percentage points below the 63.2% across the whole network.
CrossCountry at Stoke-on-Trent has slipped sharply. 59.4% of stops came within three minutes of the timetable in the latest 13 periods, 5.2 percentage points worse than the 64.6% recorded in the 13 before. Cancellations rose to 5.8% of scheduled stops from 4.1%, which is 1.7 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,568 | 56.0% | 4.5% |
| Period 6 of 2026-27 | 1,552 | 54.8% | 6.2% |
| Period 5 of 2026-27 | 1,586 | 55.3% | 5.7% |
| Period 4 of 2026-27 | 1,584 | 49.2% | 5.4% |
| Period 3 of 2026-27 | 1,559 | 58.3% | 5.0% |
| Period 2 of 2026-27 | 1,532 | 58.6% | 4.7% |
| Period 1 of 2026-27 | 1,827 | 65.5% | 4.1% |
| Period 13 of 2025-26 | 1,746 | 67.7% | 10.7% |
| Period 12 of 2025-26 | 1,588 | 68.9% | 5.0% |
| Period 11 of 2025-26 | 1,569 | 68.7% | 7.3% |
| Period 10 of 2025-26 | 1,396 | 63.3% | 5.8% |
| Period 9 of 2025-26 | 1,588 | 47.3% | 8.2% |
| Period 8 of 2025-26 | 1,541 | 57.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stoke-on-Trent
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 21,000 | 49.6% | 7.2% |
| West Midlands Railway | 12,126 | 65.9% | 4.2% |
| Northern | 11,474 | 76.9% | 2.4% |
| East Midlands Railway | 10,799 | 71.2% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out