Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

East Midlands Railway at Stoke-on-Trent

All trains at Stoke-on-TrentEast Midlands Railway across BritainWest Midlands

On time, last 13 periods71.2%Whole station: 62.2%
Cancelled2.8%Whole station: 5.0%
Scheduled stops10,799Of 76,035 at the station

How this operator is doing here

East Midlands Railway had 10,799 scheduled stops at Stoke-on-Trent in the 13 periods to Period 7 of 2026-27, 14% of the station's total. 71.2% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.

East Midlands Railway trains at Stoke-on-Trent also serve Longton (3.6 km south-east, 68.6% on time, 2.5% cancelled), Longport (4.5 km north-west, 67.2% on time, 2.8% cancelled), Blythe Bridge (8.8 km south-east, 75.5% on time, 2.4% cancelled), Kidsgrove (9.7 km north-west, 70.9% on time, 3.3% cancelled), Alsager (12.3 km north-west, 78.5% on time, 3.3% cancelled) and Crewe (19.1 km north-west, 76.5% on time, 3.3% cancelled), which are the stations on its network closest to Stoke-on-Trent.

Within 30 km of here, East Midlands Railway runs best at Alsager, 12.3 km north-west (78.5%), and worst at Longton, 3.6 km south-east (68.6%).

The busiest East Midlands Railway station within 30 km of Stoke-on-Trent is Uttoxeter, 25.0 km south-east, with about 30 scheduled stops a day.

East Midlands Railway ranks 2nd of the 5 operators with enough records at Stoke-on-Trent, on 71.2%.

Over three full railway years East Midlands Railway at Stoke-on-Trent has improved each time, from 65.6% within three minutes in 2023-24 to 71.3% in 2024-25 and 72.8% in 2025-26.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 73.6%Period 2 of 2023-24: 71.6%Period 3 of 2023-24: 55.9%Period 4 of 2023-24: 68.2%Period 5 of 2023-24: 68.1%Period 6 of 2023-24: 65.6%Period 7 of 2023-24: 61.6%Period 8 of 2023-24: 55.9%Period 9 of 2023-24: 49.6%Period 10 of 2023-24: 65.1%Period 11 of 2023-24: 67.7%Period 12 of 2023-24: 72.7%Period 13 of 2023-24: 72.5%Period 1 of 2024-25: 78.3%Period 2 of 2024-25: 65.3%Period 3 of 2024-25: 70.7%Period 4 of 2024-25: 72.5%Period 5 of 2024-25: 72.2%Period 6 of 2024-25: 75.5%Period 7 of 2024-25: 72.1%Period 8 of 2024-25: 65.3%Period 9 of 2024-25: 56.2%Period 10 of 2024-25: 72.6%Period 11 of 2024-25: 67.8%Period 12 of 2024-25: 77.0%Period 13 of 2024-25: 80.3%Period 1 of 2025-26: 84.7%Period 2 of 2025-26: 75.0%Period 3 of 2025-26: 70.9%Period 4 of 2025-26: 66.9%Period 5 of 2025-26: 68.6%Period 6 of 2025-26: 75.2%Period 7 of 2025-26: 76.1%Period 8 of 2025-26: 68.0%Period 9 of 2025-26: 57.1%Period 10 of 2025-26: 70.4%Period 11 of 2025-26: 79.5%Period 12 of 2025-26: 74.5%Period 13 of 2025-26: 79.3%Period 1 of 2026-27: 80.0%Period 2 of 2026-27: 77.6%Period 3 of 2026-27: 68.2%Period 4 of 2026-27: 62.9%Period 5 of 2026-27: 67.3%Period 6 of 2026-27: 67.8%Period 7 of 2026-27: 70.0%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 4.5%Period 2 of 2023-24: 0.9%Period 3 of 2023-24: 1.8%Period 4 of 2023-24: 1.6%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 4.6%Period 7 of 2023-24: 2.7%Period 8 of 2023-24: 7.2%Period 9 of 2023-24: 6.4%Period 10 of 2023-24: 14.7%Period 11 of 2023-24: 3.8%Period 12 of 2023-24: 1.3%Period 13 of 2023-24: 1.8%Period 1 of 2024-25: 2.3%Period 2 of 2024-25: 2.2%Period 3 of 2024-25: 3.7%Period 4 of 2024-25: 6.2%Period 5 of 2024-25: 3.4%Period 6 of 2024-25: 2.9%Period 7 of 2024-25: 3.4%Period 8 of 2024-25: 3.4%Period 9 of 2024-25: 6.8%Period 10 of 2024-25: 2.7%Period 11 of 2024-25: 7.4%Period 12 of 2024-25: 2.9%Period 13 of 2024-25: 1.8%Period 1 of 2025-26: 1.6%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 1.6%Period 4 of 2025-26: 3.4%Period 5 of 2025-26: 4.1%Period 6 of 2025-26: 2.2%Period 7 of 2025-26: 2.4%Period 8 of 2025-26: 1.8%Period 9 of 2025-26: 4.5%Period 10 of 2025-26: 1.3%Period 11 of 2025-26: 3.7%Period 12 of 2025-26: 0.8%Period 13 of 2025-26: 2.5%Period 1 of 2026-27: 2.3%Period 2 of 2026-27: 4.2%Period 3 of 2026-27: 4.5%Period 4 of 2026-27: 2.4%Period 5 of 2026-27: 4.5%Period 6 of 2026-27: 1.7%Period 7 of 2026-27: 2.5%2023-242024-252025-262026-27

See how East Midlands Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2782970.0%2.5%
Period 6 of 2026-2782867.8%1.7%
Period 5 of 2026-2782767.3%4.5%
Period 4 of 2026-2776162.9%2.4%
Period 3 of 2026-2782768.2%4.5%
Period 2 of 2026-2782877.6%4.2%
Period 1 of 2026-2795880.0%2.3%
Period 13 of 2025-2691179.3%2.5%
Period 12 of 2025-2682874.5%0.8%
Period 11 of 2025-2678679.5%3.7%
Period 10 of 2025-2676070.4%1.3%
Period 9 of 2025-2682857.1%4.5%
Period 8 of 2025-2682868.0%1.8%

Time of year

50%60%70%80%90%P1: 79.4%1P2: 72.6%2P3: 67.1%3P4: 67.5%4P5: 69.0%5P6: 71.2%6P7: 70.5%7P8: 63.6%8P9: 54.6%9P10: 69.6%10P11: 71.9%11P12: 74.8%12P13: 77.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Stoke-on-Trent

OperatorScheduled stopsWithin 3 minCancelled
Avanti21,00049.6%7.2%
CrossCountry20,63659.4%5.8%
West Midlands Railway12,12665.9%4.2%
Northern11,47476.9%2.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out