CrossCountry at Stansted Airport
All trains at Stansted AirportCrossCountry across BritainEast of England
How this operator is doing here
CrossCountry had 11,489 scheduled stops at Stansted Airport in the 13 periods to Period 7 of 2026-27, 15% of the station's total. 77.3% of recorded arrivals came within three minutes and 6.6% of stops were cancelled.
CrossCountry trains at Stansted Airport also serve Audley End (13.4 km north, 92.7% on time, 5.8% cancelled), Cambridge (35.0 km north, 65.6% on time, 5.1% cancelled), Cambridge North (38.0 km north, – on time, – cancelled), Waterbeach (41.8 km north, – on time, – cancelled), Ely (55.8 km north, 61.4% on time, 3.5% cancelled) and Manea (67.9 km north, 61.9% on time, 3.1% cancelled), which are the stations on its network closest to Stansted Airport.
The busiest CrossCountry station within 30 km of Stansted Airport is Audley End, 13.4 km north, with about 2 scheduled stops a day.
Of the 2 operators with enough records at Stansted Airport, CrossCountry is the least punctual, at 77.3%.
CrossCountry at Stansted Airport has slipped sharply. 77.3% of stops came within three minutes of the timetable in the latest 13 periods, 6.9 percentage points worse than the 84.2% recorded in the 13 before. Cancellations fell to 6.6% of scheduled stops from 7.4%, which is 0.8 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 878 | 65.7% | 5.4% |
| Period 6 of 2026-27 | 968 | 65.5% | 4.1% |
| Period 5 of 2026-27 | 964 | 63.0% | 8.3% |
| Period 4 of 2026-27 | 941 | 74.3% | 8.2% |
| Period 3 of 2026-27 | 938 | 78.5% | 4.6% |
| Period 2 of 2026-27 | 682 | 80.8% | 6.0% |
| Period 1 of 2026-27 | 898 | 86.1% | 3.1% |
| Period 13 of 2025-26 | 968 | 81.6% | 6.7% |
| Period 12 of 2025-26 | 930 | 86.0% | 6.1% |
| Period 11 of 2025-26 | 914 | 87.3% | 3.7% |
| Period 10 of 2025-26 | 614 | 80.6% | 17.1% |
| Period 9 of 2025-26 | 996 | 78.0% | 10.3% |
| Period 8 of 2025-26 | 798 | 79.7% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stansted Airport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 62,718 | 89.2% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out