Greater Anglia at Stansted Airport
All trains at Stansted AirportGreater Anglia across BritainEast of England
How this operator is doing here
Greater Anglia had 62,718 scheduled stops at Stansted Airport in the 13 periods to Period 7 of 2026-27, 85% of the station's total. 89.2% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Greater Anglia trains at Stansted Airport also serve Elsenham (Essex) (4.2 km north-west, 87.4% on time, 1.8% cancelled), Stansted Mountfitchet (4.5 km west, 87.9% on time, 2.2% cancelled), Bishops Stortford (7.0 km west, 89.4% on time, 2.4% cancelled), Newport (Essex) (10.6 km north, 87.0% on time, 1.8% cancelled), Sawbridgeworth (10.8 km south-west, 89.7% on time, 3.1% cancelled) and Audley End (13.4 km north, 86.6% on time, 2.0% cancelled), which are the stations on its network closest to Stansted Airport.
Within 30 km of here, Greater Anglia runs best at Braintree, 20.3 km east (95.8%), and worst at Cheshunt, 28.5 km south-west (85.4%).
The busiest Greater Anglia station within 30 km of Stansted Airport is Shenfield, 29.1 km south, with about 252 scheduled stops a day.
Of the 2 operators with enough records at Stansted Airport, Greater Anglia is the most punctual, at 89.2%.
Greater Anglia at Stansted Airport has slipped a little, from 91.8% within three minutes in the previous 13 periods to 89.2% in the latest 13, a fall of 2.6 percentage points. Cancellations held steady at 2.6% of scheduled stops, against 2.6% before.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,847 | 88.0% | 1.7% |
| Period 6 of 2026-27 | 5,004 | 87.1% | 2.8% |
| Period 5 of 2026-27 | 5,004 | 83.2% | 4.0% |
| Period 4 of 2026-27 | 4,964 | 88.3% | 2.3% |
| Period 3 of 2026-27 | 4,745 | 87.6% | 3.5% |
| Period 2 of 2026-27 | 4,578 | 92.8% | 1.5% |
| Period 1 of 2026-27 | 5,467 | 92.3% | 2.5% |
| Period 13 of 2025-26 | 5,100 | 88.2% | 4.2% |
| Period 12 of 2025-26 | 4,533 | 89.4% | 3.3% |
| Period 11 of 2025-26 | 4,734 | 92.3% | 1.5% |
| Period 10 of 2025-26 | 4,346 | 93.0% | 1.3% |
| Period 9 of 2025-26 | 4,750 | 85.9% | 2.3% |
| Period 8 of 2025-26 | 4,646 | 91.4% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stansted Airport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 11,489 | 77.3% | 6.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out