St James Park (Exeter)
SJPSouth WestManaged by Great Western Railway
How this station is performing
St James Park (Exeter) had 18,671 scheduled stops to Period 7 of 2026-27, about 51 a day. 82.7% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
St James Park (Exeter) opened on 26 January 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Exeter St David's is the oldest (1844) and Marsh Barton the newest (2023), with St James Park (Exeter) in between.
The nearest stations to St James Park (Exeter) are Exeter Central (0.8 km south-west), Exeter St David's (1.4 km west), Polsloe Bridge (1.5 km east), Exeter St Thomas (1.9 km south-west) and Marsh Barton (3.0 km south). 13 stations lie within 10 km in all. At 82.7%, St James Park (Exeter) is more punctual than every one of them; the best of the five, Polsloe Bridge, manages 82.1%.
For St James Park (Exeter), the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 75.6% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2024-25, at 92.6%, which is 17.0 percentage points higher.
2 of 3 stations of a similar size in South West are more punctual than St James Park (Exeter) on 82.7%. The comparison group includes Polsloe Bridge (82.1%), Carbis Bay (97.3%) and St Ives (Cornwall) (96.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 18,671 | 82.7% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at St James Park (Exeter)? Delay Repay
These operators call at St James Park (Exeter) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,440 | 86.0% | 3.2% |
| Period 6 of 2026-27 | 1,440 | 81.6% | 2.6% |
| Period 5 of 2026-27 | 1,429 | 75.6% | 3.7% |
| Period 4 of 2026-27 | 1,388 | 76.3% | 5.9% |
| Period 3 of 2026-27 | 1,426 | 79.4% | 3.8% |
| Period 2 of 2026-27 | 1,426 | 76.6% | 3.6% |
| Period 1 of 2026-27 | 1,667 | 87.3% | 1.6% |
| Period 13 of 2025-26 | 1,580 | 87.1% | 2.5% |
| Period 12 of 2025-26 | 1,343 | 90.5% | 1.2% |
| Period 11 of 2025-26 | 1,432 | 87.6% | 2.0% |
| Period 10 of 2025-26 | 1,314 | 85.1% | 5.3% |
| Period 9 of 2025-26 | 1,437 | 80.5% | 2.5% |
| Period 8 of 2025-26 | 1,349 | 79.4% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Polsloe Bridge | 18,771 | 82.1% | 3.2% |
| Carbis Bay | 18,512 | 97.3% | 1.8% |
| St Ives (Cornwall) | 18,512 | 96.9% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out