Carbis Bay
CBBSouth WestManaged by Great Western Railway
How this station is performing
Carbis Bay had 18,512 scheduled stops to Period 7 of 2026-27, about 51 a day. 97.3% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Carbis Bay opened on 1 June 1877, 149 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, St Erth is the oldest (1852) and Lelant Saltings the newest (1978), with Carbis Bay in between.
The nearest stations to Carbis Bay are St Ives (Cornwall) (1.6 km north-west), Lelant (2.5 km south-east), Lelant Saltings (2.6 km south-east), St Erth (3.3 km south-east) and Hayle (3.4 km south-east). 6 stations lie within 10 km in all. Of the five, Lelant Saltings is the most punctual at 97.8% and Hayle the least at 67.9%, with Carbis Bay on 97.3%.
Carbis Bay is one of 2 stations named after a Village called Carbis Bay, home to about 3,970 people; this one stands 0.1 km from its centre.
Compared with 3 stations of a similar size in South West, Carbis Bay is the most punctual, at 97.3%. The comparison group includes St Ives (Cornwall) (96.9%), St James Park (Exeter) (82.7%) and Polsloe Bridge (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 18,512 | 97.3% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Carbis Bay? Delay Repay
These operators call at Carbis Bay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,480 | 98.2% | 0.7% |
| Period 6 of 2026-27 | 1,488 | 97.9% | 0.9% |
| Period 5 of 2026-27 | 1,488 | 95.6% | 2.4% |
| Period 4 of 2026-27 | 1,488 | 94.3% | 3.4% |
| Period 3 of 2026-27 | 1,488 | 97.2% | 1.3% |
| Period 2 of 2026-27 | 1,488 | 98.4% | 1.2% |
| Period 1 of 2026-27 | 1,700 | 97.7% | 0.8% |
| Period 13 of 2025-26 | 1,630 | 98.0% | 1.1% |
| Period 12 of 2025-26 | 1,480 | 98.1% | 0.8% |
| Period 11 of 2025-26 | 740 | 96.9% | 6.9% |
| Period 10 of 2025-26 | 1,362 | 96.3% | 2.5% |
| Period 9 of 2025-26 | 1,200 | 98.3% | 3.2% |
| Period 8 of 2025-26 | 1,480 | 98.0% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| St Ives (Cornwall) | 18,512 | 96.9% | 1.8% |
| St James Park (Exeter) | 18,671 | 82.7% | 3.1% |
| Polsloe Bridge | 18,771 | 82.1% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out