St Ives (Cornwall)
SIVSouth WestManaged by Great Western Railway
How this station is performing
St Ives (Cornwall) had 18,512 scheduled stops to Period 7 of 2026-27, about 51 a day. 96.9% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
St Ives (Cornwall) opened on 1 June 1877. It was moved to the site it uses now on 23 May 1971. Among the 5 stations nearest to it with a known opening date, Hayle is the oldest (1852) and Lelant Saltings the newest (1978), with St Ives (Cornwall) in between.
The nearest stations to St Ives (Cornwall) are Carbis Bay (1.6 km south-east), Lelant (4.0 km south-east), Lelant Saltings (4.2 km south-east), Hayle (4.8 km south-east) and St Erth (4.9 km south-east). 5 stations lie within 10 km in all. Of the five, Lelant Saltings is the most punctual at 97.8% and Hayle the least at 67.9%, with St Ives (Cornwall) on 96.9%.
St Ives (Cornwall) is named after St Ives, a town, home to about 11,435 people, but the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in South West are more punctual than St Ives (Cornwall) on 96.9%. The comparison group includes Carbis Bay (97.3%), St James Park (Exeter) (82.7%) and Polsloe Bridge (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 18,512 | 96.9% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at St Ives (Cornwall)? Delay Repay
These operators call at St Ives (Cornwall) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,480 | 97.5% | 0.7% |
| Period 6 of 2026-27 | 1,488 | 97.4% | 0.9% |
| Period 5 of 2026-27 | 1,488 | 94.3% | 2.4% |
| Period 4 of 2026-27 | 1,488 | 94.1% | 3.5% |
| Period 3 of 2026-27 | 1,488 | 97.2% | 1.3% |
| Period 2 of 2026-27 | 1,488 | 97.7% | 1.2% |
| Period 1 of 2026-27 | 1,700 | 97.7% | 0.8% |
| Period 13 of 2025-26 | 1,630 | 98.0% | 1.1% |
| Period 12 of 2025-26 | 1,480 | 98.0% | 0.8% |
| Period 11 of 2025-26 | 740 | 96.8% | 7.0% |
| Period 10 of 2025-26 | 1,362 | 95.6% | 2.5% |
| Period 9 of 2025-26 | 1,200 | 98.8% | 3.2% |
| Period 8 of 2025-26 | 1,480 | 97.1% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carbis Bay | 18,512 | 97.3% | 1.8% |
| St James Park (Exeter) | 18,671 | 82.7% | 3.1% |
| Polsloe Bridge | 18,771 | 82.1% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out