St Bees
SBSNorth WestManaged by Northern Trains
How this station is performing
St Bees had 6,290 scheduled stops to Period 7 of 2026-27, about 17 a day. 73.2% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
St Bees opened on 19 July 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Whitehaven is the oldest (1847) and Corkickle the newest (1855), with St Bees in between.
The nearest stations to St Bees are Nethertown (4.4 km south), Corkickle (5.5 km north), Braystones (6.7 km south-east), Whitehaven (6.7 km north) and Parton (8.7 km north). 6 stations lie within 10 km in all. Of the five, Parton is the most punctual at 92.3% and Braystones the least at 65.4%, with St Bees on 73.2%.
St Bees takes its name from a Village called St Bees, home to about 1,801 people, and the station stands 0.1 km from its centre.
St Bees improved sharply over the past year. In the latest 13 periods 73.2% of stops came within three minutes of the timetable, up 9.0 percentage points from 64.2% in the 13 before. Cancellations held steady at 4.5% of scheduled stops, against 4.7% before.
2 of 3 stations of a similar size in North West are more punctual than St Bees on 73.2%. The comparison group includes Corkickle (75.5%), Ravenglass for Eskdale (74.6%) and Sellafield (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,290 | 73.2% | 4.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 480 | 69.2% | 1.0% |
| Period 6 of 2026-27 | 480 | 74.8% | 4.2% |
| Period 5 of 2026-27 | 480 | 76.1% | 2.9% |
| Period 4 of 2026-27 | 480 | 69.5% | 4.0% |
| Period 3 of 2026-27 | 480 | 74.8% | 4.4% |
| Period 2 of 2026-27 | 480 | 71.4% | 2.5% |
| Period 1 of 2026-27 | 551 | 80.1% | 1.6% |
| Period 13 of 2025-26 | 528 | 77.8% | 4.9% |
| Period 12 of 2025-26 | 481 | 76.1% | 4.0% |
| Period 11 of 2025-26 | 480 | 80.2% | 5.8% |
| Period 10 of 2025-26 | 409 | 75.7% | 13.0% |
| Period 9 of 2025-26 | 480 | 68.0% | 7.5% |
| Period 8 of 2025-26 | 481 | 57.8% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Corkickle | 6,290 | 75.5% | 4.5% |
| Ravenglass for Eskdale | 6,290 | 74.6% | 4.3% |
| Sellafield | 6,290 | 71.8% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out