Sellafield
SELNorth WestManaged by Northern Trains
How this station is performing
Sellafield had 6,290 scheduled stops to Period 7 of 2026-27, about 17 a day. 71.8% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Sellafield opened on 21 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sellafield is the oldest; the next oldest, Seascale, dates from 1849.
The nearest stations to Sellafield are Seascale (2.8 km south-east), Braystones (3.3 km north-west), Nethertown (5.7 km north-west), Drigg (6.1 km south-east) and Ravenglass for Eskdale (9.4 km south-east). 6 stations lie within 10 km in all. Of the five, Ravenglass for Eskdale is the most punctual at 74.6% and Braystones the least at 65.4%, with Sellafield on 71.8%.
Across the whole run of data, the weakest four-week period for Sellafield was Period 9 of 2024-25, at 59.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 86.6%, and the two are 26.9 percentage points apart. Cancellations peaked at 12.9% of scheduled stops in Period 9 of 2023-24, against 4.3% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Sellafield is the least punctual, at 71.8%. All of them are ahead, including Corkickle (75.5%), Ravenglass for Eskdale (74.6%) and St Bees (73.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,290 | 71.8% | 4.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 480 | 64.6% | 1.0% |
| Period 6 of 2026-27 | 480 | 72.0% | 4.0% |
| Period 5 of 2026-27 | 480 | 75.2% | 2.7% |
| Period 4 of 2026-27 | 480 | 68.0% | 3.8% |
| Period 3 of 2026-27 | 480 | 71.2% | 3.8% |
| Period 2 of 2026-27 | 480 | 69.7% | 2.5% |
| Period 1 of 2026-27 | 551 | 79.3% | 1.1% |
| Period 13 of 2025-26 | 528 | 78.5% | 4.7% |
| Period 12 of 2025-26 | 481 | 73.4% | 3.7% |
| Period 11 of 2025-26 | 480 | 77.5% | 5.6% |
| Period 10 of 2025-26 | 409 | 75.9% | 12.7% |
| Period 9 of 2025-26 | 480 | 66.4% | 7.1% |
| Period 8 of 2025-26 | 481 | 60.8% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Corkickle | 6,290 | 75.5% | 4.5% |
| Ravenglass for Eskdale | 6,290 | 74.6% | 4.3% |
| St Bees | 6,290 | 73.2% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out