Springburn
SPRScotlandManaged by ScotRail
How this station is performing
Springburn had 45,141 scheduled stops to Period 7 of 2026-27, about 124 a day. 90.7% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Springburn opened on 1 January 1887, 139 years before the latest figures here, and has not been moved since. The First World War closed Springburn on 1 January 1917, and it reopened on 2 June 1919. Among the 5 stations nearest to it with a known opening date, Bishopbriggs is the oldest (1842) and Ashfield the newest (1993), with Springburn in between.
The nearest stations to Springburn are Barnhill (0.6 km south-east), Ashfield (1.4 km north-west), Possilpark and Parkhouse (2.0 km north-west), Alexandra Parade (2.4 km south-east) and Bishopbriggs (2.5 km north). 73 stations lie within 10 km in all. Of the five, Ashfield is the most punctual at 94.2% and Barnhill the least at 89.1%, with Springburn on 90.7%.
Springburn takes its name from an urban area called Springburn, home to about 12,064 people, and the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in Scotland are more punctual than Springburn on 90.7%. The comparison group includes Pollokshaws West (95.1%), Blairhill (87.7%) and Coatdyke (88.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 45,141 | 90.7% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Springburn? Delay Repay
These operators call at Springburn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,444 | 88.5% | 2.4% |
| Period 6 of 2026-27 | 3,444 | 90.9% | 1.2% |
| Period 5 of 2026-27 | 3,444 | 91.8% | 1.2% |
| Period 4 of 2026-27 | 3,383 | 90.6% | 1.6% |
| Period 3 of 2026-27 | 3,444 | 91.5% | 2.2% |
| Period 2 of 2026-27 | 3,444 | 91.0% | 1.1% |
| Period 1 of 2026-27 | 3,977 | 90.5% | 1.6% |
| Period 13 of 2025-26 | 3,773 | 92.5% | 0.9% |
| Period 12 of 2025-26 | 3,444 | 92.9% | 1.3% |
| Period 11 of 2025-26 | 3,444 | 91.3% | 1.5% |
| Period 10 of 2025-26 | 3,044 | 91.3% | 1.5% |
| Period 9 of 2025-26 | 3,444 | 88.4% | 2.1% |
| Period 8 of 2025-26 | 3,412 | 87.1% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pollokshaws West | 45,182 | 95.1% | 1.3% |
| Blairhill | 45,088 | 87.7% | 1.9% |
| Coatdyke | 44,880 | 88.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out