Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

ScotRail at Spean Bridge

All trains at Spean BridgeScotRail across BritainScotland

On time, last 13 periods78.1%Whole station: 77.5%
Cancelled0.6%Whole station: 0.7%
Scheduled stops2,037Of 2,318 at the station

How this operator is doing here

ScotRail had 2,037 scheduled stops at Spean Bridge in the 13 periods to Period 7 of 2026-27, 88% of the station's total. 78.1% of recorded arrivals came within three minutes and 0.6% of stops were cancelled.

ScotRail trains at Spean Bridge also serve Roy Bridge (5.2 km east, 79.5% on time, 0.6% cancelled), Banavie (11.8 km south-west, 83.3% on time, 0.8% cancelled), Corpach (13.2 km south-west, 85.0% on time, 0.8% cancelled), Tulloch (13.4 km east, – on time, 0.6% cancelled), Fort William (13.6 km south-west, 82.6% on time, 0.7% cancelled) and Loch Eil Outward Bound (16.9 km west, 83.5% on time, 0.8% cancelled), which are the stations on its network closest to Spean Bridge.

The busiest ScotRail station within 30 km of Spean Bridge is Fort William, 13.6 km south-west, with about 8 scheduled stops a day.

Of the 1 operators with enough records at Spean Bridge, ScotRail is the most punctual, at 78.1%.

ScotRail at Spean Bridge improved sharply over the past year. In the latest 13 periods 78.1% of stops came within three minutes of the timetable, up 6.7 percentage points from 71.4% in the 13 before. Cancellations held steady at 0.6% of scheduled stops, against 0.7% before.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 12 of 2024-25: 80.4%Period 13 of 2024-25: 78.4%Period 1 of 2025-26: 59.4%Period 2 of 2025-26: 74.7%Period 3 of 2025-26: 57.8%Period 4 of 2025-26: 80.9%Period 6 of 2025-26: 62.5%Period 7 of 2025-26: 77.0%Period 8 of 2025-26: 89.1%Period 11 of 2025-26: 88.2%Period 12 of 2025-26: 81.0%Period 13 of 2025-26: 76.9%Period 1 of 2026-27: 86.4%Period 2 of 2026-27: 65.2%Period 3 of 2026-27: 73.0%Period 4 of 2026-27: 64.3%Period 5 of 2026-27: 78.9%Period 6 of 2026-27: 79.7%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 0.6%Period 2 of 2023-24: 0.0%Period 3 of 2023-24: 1.6%Period 4 of 2023-24: 0.0%Period 5 of 2023-24: 0.6%Period 6 of 2023-24: 0.0%Period 7 of 2023-24: 0.0%Period 8 of 2023-24: 0.0%Period 9 of 2023-24: 0.6%Period 10 of 2023-24: 4.3%Period 11 of 2023-24: 3.4%Period 12 of 2023-24: 1.3%Period 13 of 2023-24: 0.0%Period 1 of 2024-25: 1.3%Period 2 of 2024-25: 0.0%Period 3 of 2024-25: 0.0%Period 4 of 2024-25: 0.0%Period 5 of 2024-25: 0.0%Period 6 of 2024-25: 0.0%Period 7 of 2024-25: 0.0%Period 8 of 2024-25: 0.0%Period 9 of 2024-25: 1.3%Period 10 of 2024-25: 2.2%Period 11 of 2024-25: 1.4%Period 12 of 2024-25: 0.6%Period 13 of 2024-25: 0.0%Period 1 of 2025-26: 0.7%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.6%Period 5 of 2025-26: 0.0%Period 6 of 2025-26: 0.0%Period 7 of 2025-26: 2.7%Period 8 of 2025-26: 1.3%Period 9 of 2025-26: 1.7%Period 10 of 2025-26: 2.2%Period 11 of 2025-26: 1.9%Period 12 of 2025-26: 0.6%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 0.0%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 0.0%Period 4 of 2026-27: 0.0%Period 5 of 2026-27: 0.0%Period 6 of 2026-27: 1.3%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

See how ScotRail Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-27156–0.0%
Period 6 of 2026-2716079.7%1.3%
Period 5 of 2026-2716078.9%0.0%
Period 4 of 2026-2715764.3%0.0%
Period 3 of 2026-2716073.0%0.0%
Period 2 of 2026-2716065.2%0.0%
Period 1 of 2026-2718386.4%0.0%
Period 13 of 2025-2617676.9%0.0%
Period 12 of 2025-2616081.0%0.6%
Period 11 of 2025-2616088.2%1.9%
Period 10 of 2025-26135–2.2%
Period 9 of 2025-26116–1.7%
Period 8 of 2025-2615489.1%1.3%

Other operators at Spean Bridge

OperatorScheduled stopsWithin 3 minCancelled
Caledonian Sleeper281––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out