Ash Vale
AHVSouth EastManaged by South Western Railway
How this station is performing
Ash Vale had 48,275 scheduled stops to Period 7 of 2026-27, about 133 a day. 91.2% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Ash Vale opened on 2 May 1870, 156 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ash Vale is the newest; the oldest, Farnborough (Main), opened in 1838.
The nearest stations to Ash Vale are North Camp (0.8 km north-west), Ash (2.6 km south), Farnborough (Main) (3.6 km north-west), Farnborough North (3.6 km north-west) and Aldershot (4.0 km south-west). 13 stations lie within 10 km in all. At 91.2%, Ash Vale is more punctual than every one of them; the best of the five, Aldershot, manages 90.7%.
Ash Vale takes its name from a Village called Ash Vale, home to about 5,686 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Ash Vale was Period 9 of 2023-24, at 84.2%, some time before the latest year. The strongest was Period 5 of 2023-24, at 97.0%, and the two are 12.8 percentage points apart. Cancellations peaked at 5.6% of scheduled stops in Period 10 of 2023-24, against 2.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Ash Vale is the most punctual, at 91.2%. The comparison group includes Emsworth (76.7%), Southwick (81.4%) and Crawley (71.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 48,275 | 91.2% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Ash Vale? Delay Repay
These operators call at Ash Vale and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,672 | 89.3% | 2.7% |
| Period 6 of 2026-27 | 3,651 | 89.8% | 1.3% |
| Period 5 of 2026-27 | 3,792 | 89.3% | 2.4% |
| Period 4 of 2026-27 | 3,622 | 90.4% | 2.2% |
| Period 3 of 2026-27 | 3,553 | 90.6% | 3.9% |
| Period 2 of 2026-27 | 3,736 | 87.9% | 4.9% |
| Period 1 of 2026-27 | 4,297 | 93.6% | 2.4% |
| Period 13 of 2025-26 | 3,998 | 96.0% | 0.8% |
| Period 12 of 2025-26 | 3,645 | 93.2% | 0.9% |
| Period 11 of 2025-26 | 3,692 | 94.2% | 0.7% |
| Period 10 of 2025-26 | 3,281 | 92.0% | 2.0% |
| Period 9 of 2025-26 | 3,590 | 89.4% | 1.6% |
| Period 8 of 2025-26 | 3,746 | 88.5% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out