Merseyrail at Southport
How this operator is doing here
Merseyrail had 49,206 scheduled stops at Southport in the 13 periods to Period 7 of 2026-27, 70% of the station's total. 95.6% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Merseyrail trains at Southport also serve Birkdale (1.7 km south-west, 92.8% on time, 1.3% cancelled), Hillside (3.2 km south-west, 91.2% on time, 1.3% cancelled), Ainsdale (5.6 km south-west, 92.1% on time, 1.2% cancelled), Freshfield (10.0 km south-west, 92.3% on time, 1.2% cancelled), Formby (11.2 km south-west, 93.4% on time, 1.2% cancelled) and Ormskirk (11.7 km south-east, 95.3% on time, 1.5% cancelled), which are the stations on its network closest to Southport.
Within 30 km of here, Merseyrail runs best at Wallasey Grove Road, 24.7 km south (99.3%), and worst at Leasowe, 27.3 km south (72.4%).
The busiest Merseyrail station within 30 km of Southport is Liverpool Central, 27.0 km south, with about 582 scheduled stops a day.
Of the 2 operators with enough records at Southport, Merseyrail is the most punctual, at 95.6%.
For Merseyrail, Southport is the 5th best of 62 ranked stations. Its 95.6% here is 4.1 percentage points above the 91.5% across the whole network.
Cancellations of Merseyrail at Southport are near its usual level: 1.3% of scheduled stops, against 2.0% across its network and 1.9% for every operator at the station.
Period by period
See how Merseyrail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,709 | 96.6% | 1.4% |
| Period 6 of 2026-27 | 3,788 | 96.7% | 0.9% |
| Period 5 of 2026-27 | 3,852 | 95.8% | 1.4% |
| Period 4 of 2026-27 | 3,811 | 93.2% | 1.5% |
| Period 3 of 2026-27 | 3,784 | 95.6% | 0.6% |
| Period 2 of 2026-27 | 3,710 | 95.6% | 1.2% |
| Period 1 of 2026-27 | 4,288 | 94.9% | 1.2% |
| Period 13 of 2025-26 | 4,060 | 94.8% | 1.1% |
| Period 12 of 2025-26 | 3,709 | 94.9% | 1.0% |
| Period 11 of 2025-26 | 3,715 | 94.3% | 1.0% |
| Period 10 of 2025-26 | 3,356 | 97.3% | 1.4% |
| Period 9 of 2025-26 | 3,705 | 97.1% | 1.0% |
| Period 8 of 2025-26 | 3,719 | 96.4% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Southport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,616 | 74.7% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out