Northern had 20,616 scheduled stops at Southport in the 13 periods to Period 7 of 2026-27, 30% of the station's total. 74.7% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
Northern trains at Southport also serve Meols Cop (1.8 km east, 84.1% on time, 4.0% cancelled), Bescar Lane (6.3 km south-east, 64.9% on time, 3.8% cancelled), New Lane (9.7 km south-east, 73.6% on time, 3.8% cancelled), Ansdell and Fairhaven (10.6 km north, 76.1% on time, 3.3% cancelled), Lytham (10.6 km north, 76.9% on time, 3.2% cancelled) and Burscough Bridge (11.5 km south-east, 75.2% on time, 4.0% cancelled), which are the stations on its network closest to Southport.
Within 30 km of here, Northern runs best at Thatto Heath, 28.3 km south-east (90.7%), and worst at Adlington (Lancashire), 26.6 km east (56.3%).
The busiest Northern station within 30 km of Southport is Preston (Lancs), 22.9 km north-east, with about 260 scheduled stops a day.
Northern at Southport has slipped a little, from 79.0% within three minutes in the previous 13 periods to 74.7% in the latest 13, a fall of 4.3 percentage points. Cancellations fell to 3.6% of scheduled stops from 4.8%, which is 1.2 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,596 | 75.5% | 2.1% |
| Period 6 of 2026-27 | 1,580 | 78.1% | 2.5% |
| Period 5 of 2026-27 | 1,245 | 73.7% | 7.1% |
| Period 4 of 2026-27 | 1,741 | 74.8% | 2.6% |
| Period 3 of 2026-27 | 1,449 | 75.7% | 2.4% |
| Period 2 of 2026-27 | 1,596 | 76.4% | 3.0% |
| Period 1 of 2026-27 | 1,852 | 76.5% | 1.8% |
| Period 13 of 2025-26 | 1,739 | 75.9% | 4.9% |
| Period 12 of 2025-26 | 1,596 | 77.2% | 5.3% |
| Period 11 of 2025-26 | 1,596 | 77.5% | 2.6% |
| Period 10 of 2025-26 | 1,457 | 71.9% | 5.8% |
| Period 9 of 2025-26 | 1,577 | 65.5% | 3.9% |
| Period 8 of 2025-26 | 1,592 | 70.8% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Southport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 49,206 | 95.6% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out